4360 Baychester Avenue,Bronx, NY 10466

72 Units

Built in 1964

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
428 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 195 violations which is 2.7 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
34Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
114Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
47Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 27, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings, walls, doors and trim in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at eastNov sent out
Feb 27, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at washbasin in the 2nd bathroom from north at east located at apt 2d, 2nd story, 1st apartment from north at eastNov sent out
Dec 30, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from north located at apt 2d, 2nd story, 1st apartment from north at east , section ''north''Nov sent out
Dec 30, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from north located at apt 2d, 2nd story, 1st apartment from north at east , section ''north''Nov sent out
Dec 01, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the foyer located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls in the 1st room from north at east located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east and south walls in the private hallway located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2005 hmc: properly repair or replace the broken or defective lockset at door in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 01, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation door frame and casing in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Oct 24, 2023§ 27-2005 hmc: refit fire door in the public hall located at public parts, 4th story, 1st public parts from north at eastNov sent out
Oct 24, 2023§ 27-2005 hmc: refit fire door in the public hall located at public parts, 5th story, 2nd public parts from north at eastNov sent out
Oct 24, 2023§ 27-2005 hmc: refit door in the compactor closet located at public parts, 4th storyNov sent out
Oct 05, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 2nd bathroom from north located at apt 2d, 2nd story, 1st apartment from north at eastNov sent out
Oct 05, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd bathroom from north located at apt 2d, 2nd story, 1st apartment from north at eastNov sent out
Aug 01, 2023§ 27-2005 hmc: properly repair or replace the broken or defective cabinet drawer in the kitchen located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Jun 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and walls in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at eastNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and walls. in the entire apartment located at apt 6d, 6th story, 1st apartment from north at eastNov sent out
Apr 25, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the foyer located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code properly repair the broken or defective lock at entrance door in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall ( near closet door frame) in the foyer located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code properly repair the broken or defective drawer at base cabinet in the kitchen located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code properly repair the broken or defective door at cabinet on south wall in the kitchen located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 16, 2022Section 27-2005 adm code properly repair the broken or defective radiator cover in the kitchen located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Nov 29, 2022Section 27-2005 adm code properly secure the loose shower head at west wall in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Nov 29, 2022Section 27-2005 adm code refit cabinet doors at south wall in the kitchen located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Nov 03, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Nov 03, 2021Section 27-2005 adm code properly repair the broken or defective door knob at entrance in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Sep 14, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall and east window stool in the 1st room from north at east located at apt 1d, 1st story, 1st apartment from north at eastNov sent out
Sep 14, 2021Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1d, 1st story, 1st apartment from north at eastNov sent out
Jan 03, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls and ceiligg in the bathroom located at apt 6c, 6th story, 1st apartment from west at northNot complied with

Property Owners and Associates

4360 Baychester LLC
Owner, Corporate Owner
3.5(1)

2 Properties

121 Units

David Radoncic
Site Manager, Agent, Head Officer
3.5(1)

2 Properties

121 Units

Rasim Toskic
Site Manager, Agent, Head Officer
3.5(1)

2 Properties

121 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet