40 West Mosholu Parkway South,Bronx, NY 10468

415 Units

Built in 1975

42 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
428 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 91 violations which is 0.21 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
20Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
51Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
20Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 21b, 21st story, 1st apartment from north at eastNov sent out
Apr 10, 2023Section 27-2005 adm code properly repair the broken or defective closet door in the foyer located at apt 31b, 31st story, 1st apartment from east at southNov sent out
Apr 10, 2023Section 27-2005 adm code properly repair the broken or defective closet door in the private hallway located at apt 31b, 31st story, 1st apartment from east at southNov sent out
Apr 10, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 31b, 31st story, 1st apartment from east at southNov certified late
Apr 05, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 4h, 4th story, 1st apartment from west at northNov certified late
Mar 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 33c, 33rd story, 2nd apartment from north at east , section at eastNov certified late
Mar 20, 2023Section 27-2011 adm code cleanse to the satisfaction of this department the household items and garbage bags at the floor in the 3rd room from north located at apt 4m, 4th story, 2nd apartment from north at eastNov sent out
Jun 07, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 1st room from north at west located at apt 31e, 31st story, 1st apartment from east at southNov sent out
May 03, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the the floor consisting of excessive household items and garbage bags in the 3rd room from north located at apt 4m, 4th story, 2nd apartment from west at northNot complied with
Apr 30, 2021Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tile walls in the shower compartment in the bathroom located at apt 33d, 33rd story, 3rd apartment from north at eastNov sent out
Apr 23, 2021Section 27-2005 adm code refit ... terrace door in the 2nd room from north at east located at apt 36g, 36th story, 1st apartment from east at southFirst no access to re- inspect violation
Apr 23, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 4th room from north, the 2nd room from north at east located at apt 36g, 36th story, 1st apartment from east at southFirst no access to re- inspect violation
Apr 14, 2021Section 27-2005 adm code refit the door in the entrance located at apt 26m, 26th story, 2nd apartment from north at east , section at northNot complied with
Apr 14, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroom located at apt 33c, 33rd story, 2nd apartment from east at southNot complied with
Apr 14, 2021Section 27-2005 adm code properly repair the broken or defective lock and assembly in the entrance located at apt 32g, 32nd story, 2nd apartment from south at westFirst no access to re- inspect violation
Apr 14, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroom located at apt 9l, 9th story, 1st apartment from north at east , section at northNot complied with
Apr 14, 2021Section 27-2005 adm code properly repair the broken or defective mechanical ventilation system in the kitchen located at apt 36g, 36th story, 1st apartment from south at westFirst no access to re- inspect violation
Apr 14, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 9l, 9th story, 1st apartment from north at east , section at northNot complied with
Jul 31, 2019Section 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 18k, 18th story, 2nd apartment from west at northNov sent out
Mar 12, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and walls and closets in the entire apartment located at apt 20k, 20th story, 3rd apartment from south at westNov sent out

Property Owners and Associates

Alan Sullivan
Head Officer
3(12)

5 Properties

1550 Units

Dan Durante
Site Manager
3.3(6)

2 Properties

871 Units

Daniel Durante
Site Manager
3.3(6)

2 Properties

871 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Tracey Towers: Landmark of The Bronx
Former Tenant
Pros:
Great heat, great water pressure (c) openigloo ...
Cons:
The mice the mice, THE (c) openigloo MICE!
Great potential but Tenants don’t care
Former Tenant
Pros:
Large Apartments with a View
Cons:
Tenants do a poor job (c) openigloo or caring f...
Advice to owner:
More action on noise complaints