Jan 06, 2024§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jan 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jan 06, 2024§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jan 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jan 06, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2 sq.ft the west wall and the south wall in the bathroom located at apt 1, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Jan 06, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2 sq.ft at ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Jan 06, 2024§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the 6th room from east, the 1st room from east located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Oct 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall in the 1st room from east located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, east wall in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall in the 6th room from east located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 05, 2023§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Oct 05, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Oct 05, 2023§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
May 31, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd storyNov sent out
Dec 29, 2021Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color ,, west wall, east wall in the kitchen located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Dec 29, 2021Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color ,, ceiling in the 6th room from east located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Dec 29, 2021Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color ,, south wall in the 2nd private hallway located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jul 21, 2021Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at southNov sent out
Aug 24, 2018Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department door frame moulding at south wall in the foyer located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Aug 23, 2018Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls at public hall, 1st storyNov sent out
Apr 14, 2014Section 27-2005 adm code properly repair with similar material the broken or defective wood door to the bedroom in the 1st room from north at west located at apt 1, 2nd story, apartment at southNov sent out
Apr 14, 2014Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the kitchen located at apt 1, 2nd story, apartment at southNov sent out
Sep 25, 2013Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department ceiling, walls and doors through out in the entire apartment located at apt 1, 2nd story, apartment at southNov sent out