2102 Wallace Avenue,Bronx, NY 10462

148 Units

Built in 1940

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
184 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 60 violations which is 0.4 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
33Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
9Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 31, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 01, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling. , 6th storyNov sent out
Mar 10, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 20, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the eastnorth closet ceiling & walls in the 3rd room from east at north located at apt 3d, 3rd story, 1st apartment from south at westNov sent out
Apr 15, 2021Section 27-2005 adm code refit the door in the entrance located at apt 3d, 3rd story, 1st apartment from south at westNov sent out
Apr 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall around window frame in the 3rd room from east at south located at apt 3d, 3rd story, 1st apartment from south at westNov sent out
Apr 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from east at north located at apt 3d, 3rd story, 1st apartment from south at westNov sent out
Apr 15, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 3d, 3rd story, 1st apartment from south at westNov sent out
Mar 06, 2021Section 27-2005 adm code refit entrance door located at bsmt-apt ta, 3rd bsmt-apt from north at eastNov sent out
Mar 03, 2021Section 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt ta, 3rd apartment from north at eastNov sent out
May 27, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 2nd room from north at west located at apt 6c, 6th story, 1st apartment from east at southNov sent out
Apr 30, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1b, 1st story, 2nd apartment from west at northNov sent out
Apr 03, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 5b, 5th story, 2nd apartment from north at east , section '' #2118''Nov sent out
Apr 03, 2019Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 5b, 5th story, 2nd apartment from north at east , section ''#2118''Nov sent out
Mar 29, 2019Section 27-2005 adm code properly repair with similar material the broken or defective regrout ceramic tile area around bathtub in the bathroom located at apt 6b, 6th story, 2nd apartment from north at eastNov sent out
Mar 29, 2019Section 27-2005 adm code refit the door in the entrance located at apt 6b, 6th story, 2nd apartment from north at eastNov sent out
Mar 29, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 6b, 6th story, 2nd apartment from north at eastNov sent out

Property Owners and Associates

2100-2120 Wallace Owners Corp
Corporate Owner
2.5(4)

3 Properties

296 Units

2100 No Whammys LLC
Corporate Owner
2.5(4)

4 Properties

352 Units

Anthony East
Site Manager
2.5(4)

3 Properties

296 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

HORRIBLE!!!
Former Tenant
Pros:
It was close to major (c) openigloo transportat...
Cons:
Bed bugs, water bugs, mice. (c) openigloo Just ...
Advice to owner:
Get a good exterminator!