Apr 16, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Aug 25, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceilings and all walls through-out in the entire apartment located at apt 17j, 17th story, 2nd apartment from west at northNov sent out
Oct 03, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the closet in the 4th room from east located at apt 15a, 15th story, 1st apartment from east at southNov sent out
Oct 03, 2021Section 27-2005 adm code properly repair the broken or defective bell buzzer system from building entrance to apt. located at apt 15a, 15th story, 1st apartment from east at southNov sent out
Oct 03, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at window casing in the 1st room from east located at apt 15a, 15th story, 1st apartment from east at southNov sent out
Oct 03, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the 1st room from east located at apt 15a, 15th story, 1st apartment from east at southNov sent out
Oct 03, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 15a, 15th story, 1st apartment from east at southNov sent out
Oct 03, 2021Section 27-2005 adm code properly secure the loose light fixture at closet in the foyer located at apt 15a, 15th story, 1st apartment from east at southNov sent out
May 27, 2021Section 27-2005 adm code properly repair the broken or defective bell buzzer system from building entrance to apt 15k located at apt 15k, 15th story, 1st apartment from west at northNov sent out
Aug 11, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd bathroom from east at south, the 2nd room from east at north, the 1st room from east at south, the 3rd bathroom from north, the 2nd private hallway located at apt 8h, 8th story, 1st apartment from west at northNov sent out