1869 Muliner Avenue,Bronx, NY 10462

2 Units

Built in 2004

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 31 violations which is 15.5 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
5Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
23Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
2Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Jun 12, 2021Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north at west located at apt 2, 2nd story, 1st apartment from south at westNov sent out
Jun 12, 2021Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north at east located at apt 2, 2nd story, 1st apartment from south at westNov sent out
Jun 12, 2021Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at westNov sent out
Apr 07, 2021Section 27-2005 admin. code: properly repair with similar material the broken or defective regrout ceramic tiles at walls in the bathroom located at apt 2, 2nd story, 1st apartment from south at westNov sent out
Apr 07, 2021Section 27-2005 admin. code: properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at westNov sent out

Property Owners and Associates

Vega , Elvin
Owner
0(0)

1 Property

2 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet