Oct 08, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 3rd story, section at southNot complied with
Oct 08, 2019Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .... at lobby, 3rd story, section at southNot complied with
Oct 08, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at lobby, 3rd story, section at southNot complied with
Mar 25, 2015Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ..Not complied with
Mar 25, 2015Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ;;Not complied with
Mar 25, 2015Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.Not complied with
Jul 12, 2013Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the 1st bathroom located at apt 2flr, 2nd story, 1st apartment from east at southNot complied with