870 Courtlandt Avenue,Bronx, NY 10451

76 Units

Built in 2010

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
141 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 58 violations which is 0.76 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
13Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
32Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
13Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 11, 2024§ 27-2005 hmc: properly repair or replace the broken or defective door knob in the entrance located at apt 3e, 3rd story, 4th apartment from west at northNov sent out
Mar 11, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ...west wall in the 1st room from east at north located at apt 3e, 3rd story, 4th apartment from west at northNov sent out
Feb 26, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling in the kitchen located at apt 10b, 10th story, 1st apartment from west at northNotice of issuance sent to tenant
Feb 26, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 3 sq ft around window casing at north wall in the 1st room from east at north located at apt 10b, 10th story, 1st apartment from west at northNotice of issuance sent to tenant
Feb 26, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling and 3 sq ft around window casing at north wall in the 2nd room from east located at apt 10b, 10th story, 1st apartment from west at northNotice of issuance sent to tenant
Feb 26, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 8 sq ft at ceiling in the bathroom located at apt 2h, 2nd story, 1st apartment from north at eastNotice of issuance sent to tenant
Jan 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the kitchen located at apt 5a, 5th story, 2nd apartment from north at eastNov sent out
Jan 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the 1st room from north located at apt 5a, 5th story, 2nd apartment from north at eastNov sent out
Jan 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the 2nd room from north located at apt 5a, 5th story, 2nd apartment from north at eastNov sent out
Dec 11, 2023§ 27-2005 hmc: refit base cabinet door in the kitchen located at apt 5g, 5th story, 6th apartment from west at northCiv14 mailed
May 29, 2023§ 27-2005 hmc: properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 7i, 7th story, 1st apartment from east at southFirst no access to re- inspect violation
Oct 05, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 6b, 6th story, 1st apartment from west at northFirst no access to re- inspect violation
Mar 11, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and all ceilings in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at southNot complied with

Property Owners and Associates

Adam Weinstein
Head Officer
1.8(1)

1 Property

76 Units

Cesar Caceras
Site Manager
1.8(1)

1 Property

76 Units

Courtland Corner I Associates LP
Corporate Owner
1.8(1)

2 Properties

94 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Built in 2014 I believe
Former Tenant
Pros:
Washer & Dryer equipped
Cons:
Strangers ring your downstairs buzzer (c) openi...
Advice to owner:
Hire 24hr security