4600 9 Avenue,

Brooklyn, NY 11220

84 Units

Built in 1927

7 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 83 violations which is 0.98 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.59 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
42Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
18Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
2022-03-02Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in bulkhead at public hall stairs, section at northNov sent out
2022-02-18(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
2021-07-02Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
2021-03-26Section 27-2005 adm code replace with new the missing escutcheon plate near ceiling at steam riser in the bathroom located at apt 314, 3rd story, 1st apartment from north at east , section at southNot complied with
2021-02-19Section 27-2005 adm code paint metal in accordance with dept. regulation the radiator at west wall in the 4th room from east located at apt 314, 3rd story, 1st apartment from east at south , section at westNot complied with
2019-04-28Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling around sky light and all walls at bulkhead to roof at public hall, 6th story, section at southCertification postponment denied
2019-04-28Section 27-2005 adm code properly repair with similar material the broken or defective fire retardant aorund skylight at ceiling bulkhead to roof at public hall, 6th story, section at southCertification postponment denied
2019-04-28Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at bulkhead ceiling to roof at public hall, 6th story, section at southNov sent out
2019-04-28Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling aroung skylight at bulkhard to roof at public hall, 6th story, section at northNov sent out
2019-04-28Section 27-2005 adm code properly repair with similar material the broken or defective fier retardant ceiling around skylight at bulkhead to roof at public hall, 6th story, section at northCertification postponment denied
2017-01-26Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the 4th room from east, the bathroom , the kitchen , the private hallway located at apt 410, 4th story, 1st apartment from east at south , section at southNot complied with
2016-12-19Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom , the kitchen , the 1st private hallway located at apt 209, 2nd story, 2nd apartment from east at southNot complied with
2016-11-17Section 27-2005 adm code paint metal in accordance with dept. regulation the door and door frame casing in the entrance located at apt 508, 5th story, 1st apartment from south at westFalse certification
2016-06-10Section 27-2005 adm code properly secure the loose wood parquet floor in the private hallway located at apt 204, 2nd story, 1st apartment from west at northFalse certification
2016-06-10Section 27-2026 adm code repair leaky water closet flush pipe connection ..... in the bathroom located at apt 204, 2nd story, 1st apartment from west at northCiv14 mailed
2016-06-10Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 204, 2nd story, 1st apartment from west at north , section at northCiv14 mailed
2016-06-10Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... approx. 1 sq.ft. at ceiling in the bathroom located at apt 204, 2nd story, 1st apartment from west at north , section at northCiv14 mailed
2016-03-23Section 27-2005 adm code replace with new the missing safety cover plate at electrical outlets ( total of 6 ) , 1st storyNov sent out
2016-03-23Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st storyNov sent out
2015-08-21Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east located at apt 410, 4th story, 1st apartment from east at south , 1st section from east at southFirst no access to re- inspect violation
2015-08-21Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 410, 4th story, 1st apartment from east at south , 1st section from east at southFirst no access to re- inspect violation
2015-08-21Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 410, 4th story, 1st apartment from east at south , 1st section from east at southFirst no access to re- inspect violation
2015-08-21Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 410, 4th story, 1st apartment from east at south , 1st section from east at southFirst no access to re- inspect violation
Property Owners and Associates
Argus Realty 4600 Ll
Owner
3.6(3)

1 Property

84 Units

Argus Realty 4600, LLC
Agent, Corporate Owner
3.3(5)

2 Properties

144 Units

Arugus Realty 1365 LLC
Agent, Corporate Owner
2.7(12)

9 Properties

500 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.
Reviews

Gets the job done

Former Tenant
Pros:
- Neighbors are friendly - Great heat and hot w...
Cons:
- Huge issue of Mice / Rats - No Dishwasher - O...
Advice to owner:
We appreciate your caring for the people who li...
Report

Not a bad place to live

Former Tenant
Pros:
Full time porter that maintains the cleanliness...
Cons:
The laundry room is closed after 10:30 PM until...
Advice to owner:
Stop renting at such high prices at the start.
Report

"The Wild West"

Former Tenant
Pros:
Large, often charming original 20's detailed ap...
Cons:
Pest problems. Cockroaches and lots of mice are...
Advice to owner:
Maintain the amazing parquet flooring, moulding...
Report