338 14 Street,Brooklyn, NY 11215

8 Units

Built in 1931

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
12 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 65 violations which is 8.12 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
25Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
35Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
4Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Jun 04, 2023Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Jun 04, 2023Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jun 04, 2023Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies all stories at building front at fire escapeNov sent out
Jun 02, 2023Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all balconies at builing front at fire escapeNov sent out
Feb 09, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Mar 22, 2022§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 31, 2021§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 29, 2021§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 27, 2021§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Sep 10, 2021§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Sep 10, 2021§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Dec 15, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north located at apt 4r, 4th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 31, 2019§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 31, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall, 4th storyFirst no access to re- inspect violation
Jul 09, 2019§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Jul 09, 2019§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
May 29, 2019§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 23, 2018§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 02, 2018§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Sep 20, 2018§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Sep 20, 2018§ 27-2005 adm code replace with new the missing escotcheon plate at riser top in the 1st room from north located at apt 2l, 2nd story, 1st apartment from north at eastNot complied with
Sep 19, 2018§ 27-2005 adm code properly repair with similar material the broken or defective wood floor at sink in the kitchen located at apt 2l, 2nd story, apartment at eastNot complied with
Aug 07, 2018§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Dec 30, 2017§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Dec 30, 2017§ 27-2005 adm code properly repair with similar material the broken or defective tiles at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

Calvin Sitorus
Site Manager, Agent, Joint Owner
2.1(1)

1 Property

8 Units

Sitorus Realty Investment Trust
Owner
2.1(1)

1 Property

8 Units

Tiurlan Marpaung/sitorus
Joint Owner
2.1(1)

1 Property

8 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Run Down mess
Former Tenant
Pros:
Location, huge space, kitchen size
Cons:
Rodent Infestation, cracked/crumbling tub, floo...
Advice to owner:
Get someone to overhaul the whole place and do ...