495 Sterling Place,Brooklyn, NY 11238

20 Units

Built in 1925

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
63 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 92 violations which is 4.6 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
54Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
20Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Oct 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
Jul 14, 2022Section 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also a chain door guard in the entrance located at apt 3d, 3rd story, 2nd apartment from west at northNov sent out
Jul 06, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at bulkhead roof at public hall, 4th storyNov sent out
Dec 13, 2021Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tile at west and south wall in the bathroom located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
Dec 13, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at window recess at west wall in the kitchen located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
Jul 02, 2021Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ,,, in the bathroom located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
Jul 02, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls at closet in the private hallway located at apt 3c, 3rd story, 1st apartment from west at northNov sent out
May 25, 2021Section 27-2005 adm code properly repair the broken or defective (inoperative) lock on the door in the entrance in the 2nd room from east located at apt 2d, 2nd story, 2nd apartment from west at northNov sent out
May 24, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at northNov sent out
May 24, 2021Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles on the south wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at northNov sent out
Mar 18, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at northNov sent out
Mar 11, 2021Section 27-2005 adm code refit vestibule door at public hall, 1st storyNov sent out
Jan 12, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jan 12, 2021Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ..Nov sent out
Jan 12, 2021Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.Nov sent out
Jan 12, 2021Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Jan 12, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.Nov sent out
Apr 06, 2017Section 27-2005 adm code properly repair the broken or defective electric outlet at west wall in the 2nd room from north located at apt 2c, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation

Property Owners and Associates

210 Hart Street Hdfc
Corporate Owner
0(0)

16 Properties

130 Units

495 Sterling Pl Hdfc
Corporate Owner
0(0)

2 Properties

41 Units

Black Veterans For Social Justice Inc.
Owner, Agent
0(0)

3 Properties

32 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet