Apr 11, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 22, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at bulkhead roof at public hall, 3rd storyNov sent out
Dec 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 4th storyNov sent out
Dec 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall in the bathroom located at apt 3, 2nd story, 2nd apartment from east at southNov sent out
Dec 03, 2023§ 27-2065 adm code provide ventilation for water closet compartment and/or bathroom and file application for approval before doing work in the bathroom located at apt 1, 2nd story, 2nd apartment from east at southNov sent out
Dec 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3, 3rd story, 2nd apartment from east at southNov sent out
Dec 03, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 3, 3rd story, 2nd apartment from east at southNov sent out
Dec 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5, 4th story, 2nd apartment from east at southNov sent out
Nov 22, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 2nd story, 2nd apartment from east at southNov sent out
Nov 22, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 1, 2nd story, 2nd apartment from east at southNov sent out
Jun 01, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface, caulking and grouts joints of visible mold at south and west walls around bathtub in the bathroom located at apt 5, 4th story, 2nd apartment from east at southNov sent out
Jun 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the ceiling at 1st public hall bulkhead from north at westNov sent out
Jan 12, 2023§ 27-2005 adm code refit the door in the 1st room from east at north located at apt 5, 4th story, 2nd apartment from east at southNov sent out
Mar 04, 2021§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3, 3rd story, 1st apartment from east at southNot complied with
Jun 11, 2019§ 27-2065 adm code provide ventilation for water closet compartment and/or bathroom and file application for approval before doing work in the bathroom located at apt 1, 2nd story, 2nd apartment from east at southNot complied with
Apr 28, 2017§ 27-2005 adm code refit bulkhead doorNot complied with
Feb 22, 2015§ 27-2005 adm code refit the door in the entrance located at apt 6, 4th story, 1st apartment from east at southFirst no access to re- inspect violation