8 Vernon Avenue,Brooklyn, NY 11206

16 Units

Built in 1931

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
135 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 116 violations which is 7.25 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
69Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
28Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Sep 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceilings, all walls, and trim throughout at public hallNov sent out
Sep 21, 2023§ 27-2005 hmc: properly repair or replace the broken or defective wash basin stopper in the bathroom located at apt 2b, 2nd story, 2nd apartment from west at northNov sent out
Sep 21, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the floors at all stories throughout at public hallNov sent out
Sep 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the foyer , the 4th room from north, the bathroom , the 1st room from north at east located at apt 2b, 2nd story, 2nd apartment from west at northNov sent out
Aug 31, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2005 hmc: properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2005 hmc: properly repair or replace the broken or defective entry door in the 1st room from east at north located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2005 hmc: refit door in the bathroom located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2005 hmc: properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 1d, 1st story, apartment at southNov sent out
Aug 31, 2023§ 27-2005 hmc: properly repair or replace the broken or defective closet doors in the 1st room from east at north located at apt 1d, 1st story, apartment at southNov sent out
Aug 09, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface,caulking and grouts joints of visible mold at north, east and south walls around bathtub in the bathroom located at apt 3b, 3rd story, 2nd apartment from west at northNov sent out
Jul 19, 2023§ 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchen located at apt 2b, 2nd story, 2nd apartment from west at northNov sent out
Jun 22, 2023§ 27-2005 hmc: properly repair or replace the broken or defective rubber gasket on the upper and lower doors of refrigerator in the kitchen located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Mar 17, 2023Section 27-2005 adm code replace with new the broken or defective rubber gasket at lower refrigerator door in the kitchenette located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Sep 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north, the foyer , the kitchen , the bathroom , the 1st room from north at east located at apt 4b, 4th story, 2nd apartment from west at northViolation open
Sep 07, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from east at southNov sent out
Apr 21, 2022Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface with grouted joints of visible mold at north wall around bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from north at eastCiv14 mailed

Property Owners and Associates

Aaron Koffman
Officer
1.5(1)

13 Properties

231 Units

David Kramer
Head Officer
2.8(2)

18 Properties

344 Units

Lisa Management Inc
Agent
3.2(10)

25 Properties

681 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet