193 South 9 Street,Brooklyn, NY 11211

20 Units

Built in 1917

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
66 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 30 violations which is 1.5 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
5Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
18Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
7Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Nov 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1b, 2nd story, 1st apartment from west at northCiv14 mailed
Nov 12, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 8 sq.ft at east wall in the bathroom located at apt 1b, 2nd story, 1st apartment from west at northCiv14 mailed
Aug 20, 2022Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 2 sq. ft. at west wall, and 5 sq. ft. at ceiling at east closet in the private hallway located at apt 1b, 2nd story, 1st apartment from west at northViolation will be reinspected
Jun 26, 2022Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 2 sq. ft. at east wall, and 1 sq. ft. at ceiling in the bathroom located at apt 1b, 2nd story, 1st apartment from west at northViolation will be reinspected
Aug 31, 2020Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out

Property Owners and Associates

Agata Landa
Site Manager
0(0)

1 Property

20 Units

Jeno Guttmann
Shareholder, Officer, Head Officer
0(0)

3 Properties

88 Units

Moshe Schweid
Shareholder
0(0)

1 Property

20 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet