262 South 1 Street,Brooklyn, NY 11211

24 Units

Built in 1915

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
34 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 18 violations which is 0.75 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
9Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
5Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
3Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 23, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 6b, 6th story, 1st apartment from south at westViolation open
Apr 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective south wall base cabinet doors in the kitchen located at apt 6a, 6th story, 2nd apartment from south at westViolation open
Apr 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective south wall base cabinets in the kitchen located at apt 5a, 5th story, 2nd apartment from south at westViolation open
Apr 23, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from east at southViolation open
Apr 23, 2024§ 27-2005 adm code properly repair with similar material the broken or defective caulking at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from east at southViolation open
Apr 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the bulkhead ceilingViolation open
May 05, 2022§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze finish at bathtub in the bathroom located at apt 1d, 1st story, 2nd apartment from north at eastNot complied with
May 05, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls throughout located at apt 1b, 1st story, 2nd apartment from south at westFirst no access to re- inspect violation
Feb 20, 2020§ 27-2026 adm code replace the broken or defective porcelain at bathtub in the bathroom located at apt 1d, 1st story, 2nd apartment from north at eastNot complied with

Property Owners and Associates

Dev Associates Buff
Corporate Owner
2.6(1)

3 Properties

101 Units

Kraus, Herman I. Tr
Owner
2.6(1)

1 Property

24 Units

Kraus Management Inc
Agent
3(4)

48 Properties

1732 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

OLD AND RUSTY
Former Tenant
Pros:
Not tiny apartments and great (c) openigloo loc...
Cons:
Elevator is old. Fire escapes (c) openigloo rus...
Advice to owner:
Care about the tenants that continue to put mon...