Oct 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd storyNov sent out
Oct 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall at public hall, 3rd storyNov sent out
Oct 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ar west wall at skylight opening at public hall, 3rd storyNov sent out
Oct 20, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies at east yard at fire escapeNov sent out
Oct 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department and walls and ceiling throughout in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at eastNov sent out
Jul 31, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd storyNov sent out
Jul 31, 2023§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Jul 31, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNov sent out
Jun 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north, the kitchen , the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from south at westNov sent out
Jul 06, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. in the private hallway located at apt 3r, 1st storyNov sent out
Jul 06, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling around skylight window in the private hallway located at apt 3r, 3rd storyNov sent out
Apr 30, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling throughout at basementNov sent out
Mar 01, 2021Section 27-2005 adm code properly repair the broken or defective electrical outlet at east wall in the kitchen located at apt 3r, 3rd story, apartment at southNov sent out
Feb 17, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Feb 17, 2021Section 27-2005 adm code properly secure the loose light fixture at ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Feb 17, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east and north walls in the kitchen located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Feb 17, 2021Section 27-2005 adm code properly secure the loose light fixture at ceiling in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Feb 16, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the walls and ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from east at southNov sent out
Aug 22, 2017Section 27-2005 adm code refit south and north windows west wall in the kitchen located at apt 3l, 3rd story, 1st apartment from south at westNov sent out
Aug 22, 2017Section 27-2005 adm code refit south and north windows east wall in the 1st room from east located at apt 3l, 3rd story, 1st apartment from south at westNov sent out
Aug 22, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jul 15, 2017Section 27-2005 adm code refit windows lower sash in the kitchen located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Jun 13, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 3r, 3rd story, 2nd apartment from north at eastNov sent out
Jun 13, 2017Section 27-2005 adm code properly repair the broken or defective mail box at vestibule assigned to 3rd story apartment 3r , 1st storyNov sent out