1130 Willoughby Avenue,Brooklyn, NY 11237

6 Units

Built in 1931

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
20 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 77 violations which is 12.83 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
44Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
15Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Sep 28, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1r, 1st story, 1st apartment from east at southNov sent out
Jul 11, 2022Section 27-2005 adm code refit door in the entrance located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Aug 23, 2021Section 27-2005 adm code properly repair the broken or defective entrance door frame header located at apt 2r, 2nd story, 1st apartment from east at southNov sent out
May 10, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
May 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd storyNov sent out
May 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the east and west wall at scuttle opeiningNov sent out
May 10, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at cellarNov sent out
May 10, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
May 10, 2021Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st storyNov sent out
May 10, 2021Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
May 10, 2021Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNov sent out
Jan 24, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at southNov sent out
Jan 22, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from east at southNov sent out
Nov 18, 2020Section 27-2005 adm code refit first window from south at west wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Nov 18, 2020Section 27-2005 adm code refit second window from south at west wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Nov 18, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Apr 18, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from south at westNov sent out
Aug 30, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the 1st room from north, the 3rd room from north, the kitchen , the bathroom located at apt 2l, 2nd story, 1st apartment from north at eastNov sent out

Property Owners and Associates

Boodhan, Jagidish
Owner
0(0)

1 Property

6 Units

Jagidish Boodhan
Site Manager, Agent, Joint Owner
0(0)

1 Property

6 Units

Mohaney Boodhan
Joint Owner
0(0)

1 Property

6 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet