Jan 24, 2018Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration : door erected at east section of public hall enclosing main entry doors to apt. 3r and 3l at public hall, 3rd storyNov sent out
Apr 24, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Mar 06, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Mar 01, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Nov 19, 2016Section 27-2005 adm code refit door in the entrance located at apt 3r, 3rd story, 1st apartment from east at southInvalid certification
Nov 17, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department .. ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from north at eastNov certified late
Nov 17, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department .. 1st window frame from west at north wall in the 1st room from north located at apt 3l, 3rd story, 1st apartment from north at eastNov sent out
Sep 04, 2013Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... approx.15 sq ft at ceiling and south wall closet. in the 1st room from east located at apt 1r, 1st story, 1st apartment from south at westNov sent out
Jun 11, 2013Section 27-2005 adm code properly repair the broken or defective ventilation system in the bathroom located at apt 3r, 3rd story, apartment at westNov sent out
Jun 11, 2013Section 27-2005 adm code properly secure the loose base cabinet to wall at the washbasin in the bathroom located at apt 3r, 3rd story, apartment at westNov sent out