62 Bleecker Street,Brooklyn, NY 11221

3 Units

Built in 1930

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
4 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 145 violations which is 48.33 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
35Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
70Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
39Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Mar 21, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 23, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 07, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 21, 2020Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (missing) at public hall, 1st storyNov sent out
Jan 21, 2020Section 27-2048 adm code paint or post a sign indicating floors at all stories at public hallNov sent out
Jan 21, 2020Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jan 21, 2020Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Aug 09, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator at east in the kitchen located at apt 3, 3rd story, 1st apartment from north at eastNov sent out
May 26, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNov sent out
Apr 29, 2019Section 27-2005 adm code properly repair the broken or defective sash lock at 2nd window from north at east in the kitchen located at apt 1, 1st story, apartment at eastNov sent out
Feb 20, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Feb 20, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Dec 28, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby, 1st storyNov sent out
Dec 28, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at lobby, 1st storyNov sent out
Dec 10, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at north wall in the 4th room from east at north located at apt 3floo, 3rd story, 1st apartment from north at eastNot complied with
Oct 30, 2018Section 27-2005 adm code properly repair the broken or defective bell from building entrance to unit located at apt 3floo, 3rd story, 1st apartment from north at eastNot complied with
Oct 30, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Oct 10, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNot complied with
Oct 07, 2018Section 27-2026 adm code repair the leaky and/or defective faucets at tub in the 4th bathroom from east at south located at apt 3floo, 3rd story, 1st apartment from north at eastNot complied with
Oct 07, 2018Section 27-2005 adm code properly repair the broken or defective wash basin, base cabinet, at east wall, in the 4th bathroom from east at south located at apt 3floo, 3rd story, 1st apartment from north at eastNot complied with
Sep 21, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Jul 15, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Jul 15, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st storyNot complied with
May 14, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
May 06, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ,all walls and ceiling in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at northSecond no access to re-inspect violation
May 02, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at north located at apt 3, 3rd story, 1st apartment from north at eastNot complied with
Mar 29, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at north located at apt 3floo, 2nd story, 1st apartment from north at eastNot complied with
Mar 27, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with
Mar 27, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNot complied with
Aug 22, 2017Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor . . . at public hallNot complied with
May 19, 2017Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNot complied with
Dec 15, 2016Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st storyNot complied with
Jun 10, 2016Section 27-2005 adm code properly repair with similar material the broken or defective grout at the ceramic tiled floor in the bathroom located at apt 1, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 10, 2016Section 27-2005 adm code paint metal in accordance with dept. regulation the metal ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
May 10, 2015Section 27-2005 adm code properly repair the broken or defective upper sash spring balance at south-1 window in the 2nd room from north at east located at apt 2, 3rd story, 1st apartment from east at southFirst no access to re- inspect violation

Property Owners and Associates

Heredia, Tito
Owner
0(0)

1 Property

3 Units

Tito Heredia
Site Manager, Owner
0(0)

1 Property

3 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet