300 Grove Street,Brooklyn, NY 11237

6 Units

Built in 1931

3 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
18 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 54 violations which is 9 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
31Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
6Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 10, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 23, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Sep 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd storyNov sent out
Sep 27, 2022Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNov sent out
Feb 25, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 09, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Nov 20, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, vestibule at public hall, 1st storyNov sent out
Apr 10, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall at public hall, 3rd storyNov sent out
Mar 13, 2020Section 27-2005 adm code refit gate at building front yardNov sent out
Nov 14, 2018Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock drop ceiling in the 2nd bathroom from north located at apt 3r, 3rd story, 1st apartment from south at westNov sent out
Nov 14, 2018Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock drop ceiling in the 4th bathroom from north located at apt 3r, 3rd story, 1st apartment from south at westNov sent out
Nov 14, 2018Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st storyNov sent out
Nov 14, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Nov 14, 2018Section 27-2048 adm code paint or post a sign indicating floors missing at all stories at public hallNov sent out
Mar 13, 2018Section 27-2005 adm code properly repair the broken or defective buzzer system at east wall in the foyer located at apt 3r, 3rd story, apartment at westNov sent out
Jan 29, 2016Section 27-2010, 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. yard at eastNov sent out
Sep 24, 2015Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st storyNov sent out

Property Owners and Associates

Atlantic Bricks, LLC
Owner, Corporate Owner
2.5(5)

2 Properties

12 Units

Broadway Units LLC
Owner, Corporate Owner
2.8(3)

2 Properties

10 Units

Corona Units, LLC
Owner, Corporate Owner
2.8(3)

3 Properties

9 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Weird property manager
Former Tenant
Pros:
Neighbors are friendly Rent controlled(?)
Cons:
Property manager is creepy
Advice to owner:
Don’t walk into our aprtments without permissio...
My favorite apt but so dirty
Former Tenant
Pros:
Love the neighbors. Hate the (c) openigloo land...
Cons:
Bugs!!!! Everywhere all the time
Advice to owner:
Chill out okay…
Landlord is scammy
Former Tenant
Pros:
There are none
Cons:
Landlord never gave me my (c) openigloo securit...
Advice to owner:
Stop stealing from your tenants.