Apr 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Apr 19, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 1st window frame from north at east wall in the 1st room from east at south located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Apr 19, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 1st window frame from east at south wall in the 2nd room from east at south located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Mar 26, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 1st room from east, the 4th room from east located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Mar 26, 2024§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st storyNov sent out