87 East 53 Street,Brooklyn, NY 11203

24 Units

Built in 1930

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
156 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 115 violations which is 4.79 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
24Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
60Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
30Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Feb 01, 2024§27-2153 adm code post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. postNov sent out
Jan 23, 2024§ 27-2005 adm code properly repair with similar material the broken or defective enamel glaze at bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
Jan 23, 2024§ 27-2026 adm code repair the broken or defective connection at flushing apparatus in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
Jan 23, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north at east located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
Jan 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at west located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
Jan 23, 2024§ 27-2005 hmc: properly repair or replace the broken or defective intercom/buzzer from building entrance in the foyer located at apt 2a, 2nd story, 1st apartment from south at westNov sent out
May 18, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from south at westNot complied with
May 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north at east located at apt 4a, 4th story, 1st apartment from south at westNot complied with
May 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 4c, 4th story, 1st apartment from west at northNot complied with
Oct 06, 2022§ 27-2026 adm code repair leaky water closet flush pipe connection ; at flushometer in the bathroom located at apt 1d, 1st story, 3rd apartment from west at northNot complied with
Aug 29, 2022§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bath tub in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 29, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 3c, 3rd story, 1st apartment from west at northNot complied with
Aug 29, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the foyer located at apt 3c, 3rd story, 1st apartment from west at northNot complied with
Aug 15, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and and all walls in the bathroom located at apt 2f, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Aug 15, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 1f, 1st story, 1st apartment from north at eastNot complied with
Aug 15, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, all wall and trim througout in the entire apartment located at apt 1f, 1st story, 1st apartment from north at eastNot complied with
Aug 12, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at westNot complied with
Jul 27, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department wood frame at entrance door in the 3rd room from north located at apt 1f, 1st story, 2nd apartment from north at eastNot complied with
Jul 27, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department wood frame at entrance ddor in the bathroom located at apt 1f, 1st story, 2nd apartment from north at eastNot complied with
Jul 11, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 3e, 3rd story, 1st apartment from north at eastNot complied with
Jun 07, 2022§ 27-2005 adm code properly secure the loose escutcheon plate at the top of steam riser in the kitchen located at apt 2a, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 07, 2022§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glazed surface at bathtub in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 07, 2022§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2a, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 30, 2020§ 27-2005 adm code paint metal in accordance with dept. regulation all metal surfaces in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at northNot complied with

Property Owners and Associates

East 53 Bsd Realty LLC
Corporate Owner
0(0)

2 Properties

32 Units

Harrison Prospect Partners LLC
Corporate Owner
3.1(29)

27 Properties

236 Units

Joseph Aizer
Agent, Head Officer
2.8(11)

15 Properties

156 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet