Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 3 square feet at ceiling in the 3rd room from north at east located at apt 1e, 1st story, 1st apartment from north at eastCiv14 mailed
Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 square feet at window recess from east at south wall in the bathroom located at apt 1e, 1st story, 1st apartment from north at eastCiv14 mailed
Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 square feet at window recess at east wall in the 3rd room from north at east located at apt 1e, 1st story, 1st apartment from north at eastCiv14 mailed
Jan 10, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall, east wall, ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at eastCiv14 mailed
May 06, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th storyNot complied with
May 06, 2021Section 27-2005 adm code refit vestibule door at public hall, 1st storyNot complied with
May 06, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th storyNot complied with
Mar 29, 2021Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Dec 09, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall in the 2nd room from east located at apt 1f, 1st story, 2nd apartment from north at eastNov sent out
Jun 06, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceiling walls and trims in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west , section at southNot complied with
Jun 17, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen , the 3rd room from north at east, the 3rd room from north at west located at apt 3d, 3rd story, 1st apartment from east at southNot complied with