290 East 53 Street,Brooklyn, NY 11203

27 Units

Built in 1920

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
49 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 88 violations which is 3.25 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
16Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
39Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
33Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the ceiling in the bathroom located at apt a2, 1st story, 1st apartment from west at northNov sent out
Feb 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 3 sq ft at the window frame in the bathroom located at apt a2, 1st story, 1st apartment from west at northNotice of issuance sent to tenant
Feb 20, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the 3rd room from north at west located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 3rd room from north at west located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door, 2nd closet from south at west wall door in the private hallway located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from west at north wall, 1st riser from north at east wall in the 3rd room from north at west located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall, north wall in the bathroom located at apt a2, 1st story, 1st apartment from west at northNov sent out
Nov 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from north located at apt a2, 1st story, 1st apartment from west at northNov sent out
Sep 10, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the bathroom , the 2nd room from east located at apt a5, 1st story, 1st apartment from east at southFirst no access to re- inspect violation
Jul 20, 2019Section 27-2005 adm code refit door in the bathroom located at apt a4, 1st story, 1st apartment from south at westNot complied with
Jun 03, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt c7, 3rd story, 2nd apartment from west at northFirst no access to re- inspect violation
May 24, 2019Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt c7, 3rd story, 2nd apartment from west at northFirst no access to re- inspect violation
May 23, 2019Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt c7, 3rd story, 2nd apartment from west at northFirst no access to re- inspect violation
Jan 24, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at bulkhead , 4th storyNot complied with

Property Owners and Associates

711-713 West 180th Holding LP
Corporate Owner
2.7(25)

32 Properties

1006 Units

Barberry Rose Management Co. Inc.
Agent
2.6(17)

26 Properties

919 Units

Bob Billingy
Site Manager
0(0)

1 Property

27 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet