552 Parkside Avenue,Brooklyn, NY 11226

30 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
71 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 100 violations which is 3.33 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
18Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
56Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
26Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jan 10, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from north located at apt f2, 6th story, 1st apartment from north at eastNov sent out
Jan 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approxiate 4 sq ft at ceiling in the bathroom located at apt f2, 6th story, 1st apartment from north at eastNotice of issuance sent to tenant
Jan 10, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt f2, 6th story, 1st apartment from north at eastNov sent out
Jan 10, 2024§ 27-2005 adm code replace with new the missing escutcheon plate at riser in the bathroom located at apt f2, 6th story, 1st apartment from north at eastNov sent out
Nov 09, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt e1, 5th story, 1st apartment from west at northNov sent out
Nov 09, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at the bathtub in the bathroom located at apt e1, 5th story, 1st apartment from west at northNov sent out
Mar 24, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 02, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and north wall in the bathroom located at apt 5f, 5th story, 1st apartment from south at westNov sent out
Mar 16, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt e1, 5th story, 1st apartment from west at northNov sent out
Mar 01, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 12, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Nov 18, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department north wall at bulkhead leading to roof at public hall, 6th storyNov sent out
Nov 18, 2020Section 27-2005 adm code replace with new the missing electrical outlets (2) safety covers at west wall at public hall, 1st storyNov sent out
Nov 12, 2020Section 27-2005 adm code properly repair the broken or defective (inoperable) bell buzzer/intercom system at front of building, 1st story to panel at west wall in the foyer located at apt f1, 6th story, apartment at northNov sent out
Aug 17, 2020Section 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyNov sent out
Aug 17, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st storyNov sent out
Jan 24, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling at southeast closet in the 1st room from north at east located at apt f2, 6th story, 1st apartment from north at eastNov sent out
Oct 16, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt a2, 1st story, 1st apartment from north at eastNot complied with

Property Owners and Associates

Benzi Chill LLC
Corporate Owner
3.6(1)

2 Properties

46 Units

Troy Industries, LLC
Corporate Owner
3.3(96)

63 Properties

3061 Units

Yechiel Weinberger
Site Manager, Agent, Head Officer
3.2(62)

56 Properties

2745 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Family style building
Former Tenant
Pros:
Close to the train Q, (c) openigloo 2 and 5
Cons:
Poor garbage disposal