141 Lenox Road,Brooklyn, NY 11226

66 Units

Built in 1954

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
120 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 65 violations which is 0.98 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
16Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
40Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
9Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 6e, 6th story, 3rd apartment from west at northCiv14 mailed
Feb 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... (approx 1 sq ft) on 1st closet from east at south wall wall in the 1st room from east at north located at apt 6e, 6th story, 3rd apartment from west at northCiv14 mailed
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 2f, 2nd story, 1st apartment from north at eastCiv14 mailed
Dec 16, 2023§ 27-2005 hmc: properly repair or replace the broken or defective intercom system at east wall in the private hallway located at apt 5j, 5th story, 1st apartment from east at southCiv14 mailed
Jun 12, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 4e, 4th story, 3rd apartment from west at northNov sent out
May 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 4h, 4th story, 3rd apartment from north at eastNov sent out
Mar 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at west, east walls and ceiling at vestibule at public hall, 1st storyInvalid certification
Feb 19, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from south at westInvalid certification
Feb 19, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south and east walls in the 4th room from east at south located at apt 3l, 3rd story, 1st apartment from south at westInvalid certification
Feb 19, 2023Section 27-2005 adm code replace with new the missing cover at ceiling light fixture in the 1st private hallway located at apt 3l, 3rd story, 1st apartment from south at westInvalid certification
Feb 19, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation the heat riser at west wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at westInvalid certification
Feb 19, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in the kitchen located at apt 3l, 3rd story, 1st apartment from south at westInvalid certification
Mar 09, 2021Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration studs and sheetrock partition erected from floor to ceiling with lockable door creating additional room in the 1st room from east located at apt 1b, 1st story, 2nd apartment from south at west , section at northFirst no access to re- inspect violation
Feb 10, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at cellar at laundry roomNot complied with
Feb 10, 2020Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected from floor to ceiling creating room in the 1st room from east located at apt 2b, 2nd story, 2nd apartment from south at westFirst no access to re- inspect violation
Feb 14, 2016Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at window frame the 1st window from west at north, in the bathroom located at apt 6d, 6th story, 2nd apartment from west at northNot complied with

Property Owners and Associates

141 Lenox Road LLC
Owner, Corporate Owner, Agent
3.9(6)

2 Properties

127 Units

2-12 Pinehurst LLC
Owner, Corporate Owner, Agent
2.7(68)

34 Properties

1449 Units

Juda Stern
Site Manager, Head Officer
3.9(2)

5 Properties

484 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet