21 St Pauls Court,Brooklyn, NY 11226

36 Units

Built in 1930

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
66 complaints
See all 311 complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 143 violations which is 3.97 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
36Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
50Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
56Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Dec 29, 2023§ 27-2005 hmc: properly repair or replace the broken or defective cracked wood door, at north wall, in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at southNov sent out
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall, 1st window frame from east at south wall, ceiling in the 3rd room from east located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroom located at apt 1b, 1st story, 1st apartment from north at east , section ''south''Civ14 mailed
Dec 29, 2023§ 27-2005 hmc: properly repair or replace the broken or defective base cabinet underneath wash basin at west wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east , section ''south''Civ14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st door frame from west at north wall, 1st radiator from east at south wall in the 2nd room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the 1st room from east at south, the kitchen located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st radiator from south at west wall, 2nd window frame from east at south wall in the 3rd room from east located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 1sqft ) ceiling in the 1st room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 2 sqft ) 1st door frame from west at north wall in the bathroom located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 2nd room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from south at west wall, 2nd window frame from east at south wall, 1st window frame from east at south wall in the 3rd room from east located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ( approximately 1s1ft) 1st window frame from east at south wall in the 2nd room from east at south located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall in the foyer located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door, west wall, south wall in the foyer located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st door frame from west at north wall, 1st closet from south at west wall door frame in the foyer located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the foyer located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Dec 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame, 1st closet from south at west wall door in the foyer located at apt 6b, 6th story, 1st apartment from east at southCiv14 mailed
Nov 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2005 hmc: properly repair or replace the broken or defective base cabinet doors at north in the kitchen located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2005 hmc: properly repair or replace the broken or defective caulking around the bathtub in the bathroom located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2026 adm code repair the broken or defective connection wasteline at sink in the kitchen located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 6sq ft at west in the 5th room from north located at apt 2c, 2nd story, 2nd apartment from north at eastNotice of issuance sent to tenant
Nov 14, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4sq ft at base cabinet bottom in the kitchen located at apt 2c, 2nd story, 2nd apartment from north at eastNotice of issuance sent to tenant
Nov 14, 2023§ 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Nov 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north located at apt 2c, 2nd story, 2nd apartment from north at eastCiv14 mailed
Aug 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at south and east walls in the bathroom located at apt 5b, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
Jun 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at public hall, 1st storyFalse certification
May 25, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3b, 3rd story, 1st apartment from east at southFirst no access to re- inspect violation
May 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from east located at apt 5b, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
Feb 05, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at westNot complied with
Feb 15, 2019§ 27-2011 adm code cleanse to the satisfaction of this department the bathtub in the bathroom located at apt 1b, 1st story, 3rd apartment from north at eastNot complied with
Jan 20, 2018§ 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing chain gaurd in the entrance located at apt 4e, 4th story, 1st apartment from west at northNot complied with

Property Owners and Associates

1298 David Inc
Owner, Corporate Owner
3(93)

82 Properties

2810 Units

James Dimitriades
Site Manager, Officer
2.5(2)

3 Properties

68 Units

Meridian Properties LLC
Agent
2.9(112)

105 Properties

3682 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Experience wasn’t great
Former Tenant
Pros:
Very Spacious apartments
Cons:
Water pressure, heat, only 1 (c) openigloo one ...
Advice to owner:
Fix the water pressure, provide better insulati...