150 East 19 Street,Brooklyn, NY 11226

50 Units

Built in 1935

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform

Available listings in 150 East 19 Street

Hey smart renter!
In the past three years, this building had:
217 complaints
See all 311 complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 64 violations which is 1.28 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
28Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
20Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
16Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 3rd room from north at west located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the 1st room from north located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Jan 06, 2024§ 27-2005 hmc: properly repair or replace the broken or defective base cabinet at south in the kitchen located at apt 1a, 1st story, 3rd apartment from east at southNov sent out
Jan 06, 2024§ 27-2005 hmc: properly repair or replace the broken or defective latch set at door in the 3rd room from north at west located at apt 1a, 1st story, 3rd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective reglaze the porcelain paintn at bathtub in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 hmc: properly repair or replace the broken or defective escutcheon plate at top of heat riser, west wall, in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, ceiling in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at west wall in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the 1st door frame from east at south wall in the 3rd room from north at west located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall in the private hallway located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st wall cabinet from south at west wall in the private hallway located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall, south wall, north wall, ceiling, west wall, south wall, north wall, ceiling, west wall, south wall, north wall, ceiling in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, baseboard at east wall in the 1st room from north located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at( approcimately) 2 sqft south wall in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southInvalid certification
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at(approcimately )2sqt 1st window frame from east at south wall in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southInvalid certification
Dec 27, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door frame from east at south wall, 1st closet from west at north wall door frame, 1st radiator from east at south wall in the 1st room from north located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 3rd room from north at east located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door frame from north at east wall, 2nd window frame from north at east wall in the 3rd room from north at east located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3h, 3rd story, 2nd apartment from east at southNov sent out
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at(approximately1sqft) ceiling in the bathroom located at apt 3h, 3rd story, 2nd apartment from east at southInvalid certification
Dec 27, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at (approcimately 2sqft) south wall in the kitchen located at apt 3h, 3rd story, 2nd apartment from east at southCiv14 mailed
Nov 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 1d, 1st story, 2nd apartment from west at northCertification postponment granted
Jan 25, 2013§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partitions erected subdividing room creating two seperate rooms in the 1st room from east at north located at apt 6e, 6th story, 3rd apartment from west at northFirst no access to re- inspect violation

Property Owners and Associates

East 19 Residence Corp
Owner, Corporate Owner
2.7(4)

2 Properties

275 Units

Lafayette Morrison Hdfc
Owner, Corporate Owner
2.7(18)

13 Properties

1701 Units

Saul Friedman
Site Manager, Agent, Head Officer
2.8(16)

12 Properties

1458 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Building would be great if management cared
Former Tenant
Pros:
Neighbors, neighborhood, pretty quiet, super (c...
Cons:
Management does not care about (c) openigloo it...
Advice to owner:
Manage problems, open 311 complaints, care abou...