302 Avenue C,Brooklyn, NY 11218

23 Units

Built in 1922

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
27 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 81 violations which is 3.52 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
33Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
37Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
11Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
May 31, 2023Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
May 31, 2023Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency's housing information guide. a sample notice can be found at www.nyc.gov/hpd.Nov sent out
Jan 13, 2022Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustical tiles installed at ceiling in the kitchen located at apt a5, 1st story, 1st apartment from north at eastNov sent out
Jan 13, 2022Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustical tiles installed at ceiling in the bathroom located at apt a5, 1st story, 1st apartment from north at eastNov sent out
Dec 23, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 6d, 4th story, 2nd apartment from north at eastNov sent out
Apr 23, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyInvalid certification
Apr 23, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedInvalid certification
Apr 12, 2019Section 27-2005 adm code properly repair the broken or defective (inoperative) bell/buzzer/intercom system from 1st story front entrance of building to panel at east wall in the foyer located at apt a2, 1st story, apartment at westInvalid certification
Apr 11, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ..all walls in the entire apartment located at apt a2, 1st story, apartment at westInvalid certification
Apr 11, 2019Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt a2, 1st story, apartment at westInvalid certification
Apr 11, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedInvalid certification
Apr 11, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyInvalid certification
Jan 25, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at bulkheadInvalid certification
Jan 25, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyInvalid certification
Jan 25, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedInvalid certification
Dec 05, 2017Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Dec 05, 2017Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st storyNov sent out
Dec 05, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Aug 18, 2017Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt c6, 3rd story, 2nd apartment from north at eastNov sent out
Apr 22, 2015Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency''s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Apr 19, 2015Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency''s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
May 19, 2014Section 27-2005 adm code properly secure the loose door hings in the entrance located at apt a3, 1st story, 1st apartment from east at southInvalid certification
May 16, 2014Section 27-2005 adm code replace with new the broken or defective wooden floor unlevel in the 1st room from east at south located at apt a3, 1st story, 2nd apartment from east at southInvalid certification
May 16, 2014Section 27-2005 adm code replace with new the broken or defective door in the bathroom located at apt a3, 1st story, 2nd apartment from east at southInvalid certification
May 16, 2014Section 27-2005 adm code replace with new the broken or defective electrical outlet in the 1st room from east located at apt a3, 1st story, apartment at southInvalid certification
May 16, 2014Section 27-2005 adm code properly repair the broken or defective wooden window sile in the 1st room from east located at apt a3, 1st story, apartment at southInvalid certification
May 16, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department wall sand ceiling in the entire apartment located at apt a3, 1st story, apartment at southInvalid certification
Jan 16, 2014Section 27-2005 adm code refit door in the entrance located at apt a2, 1st story, 1st apartment from south at westNov sent out
Aug 16, 2013Section 27-2005 adm code properly repair the broken or defective intercom system in the foyer located at apt d5, 4th story, 1st apartment from east at southNov certified late
Aug 16, 2013Section 27-2005 adm code refit door in the bathroom located at apt d5, 4th story, 1st apartment from east at southNov certified late
Aug 16, 2013Section 27-2005 adm code replace with new the missing door knob in the bathroom located at apt d5, 4th story, 1st apartment from east at southNov certified late
Aug 16, 2013Section 27-2005 adm code properly repair the broken or defective ceiling light fixture in the foyer located at apt d5, 4th story, 1st apartment from east at southNov certified late
Aug 16, 2013Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt d5, 4th story, 1st apartment from east at southNov certified late

Property Owners and Associates

302 Avenue C Realty LLC
Owner, Corporate Owner
4.8(1)

2 Properties

45 Units

Emanuel Panitz
Head Officer
4.8(1)

1 Property

23 Units

Enea Myftari
Site Manager
4.8(1)

1 Property

23 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Love this place!
Former Tenant
Pros:
Lovely location, good size units, (c) openigloo...
Cons:
Only thing i can think (c) openigloo of is that...
Advice to owner:
Please fix the super loud courtyard door and co...