Mar 09, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood moulding around window in the bathroom located at apt b45, 4th story, 1st apartment from north at eastCiv14 mailed
Mar 09, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 3 sq ft at window recess in the bathroom located at apt b45, 4th story, 1st apartment from north at eastCiv14 mailed
Mar 09, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 sq ft at window recess 2 sq ft at east wall in the 1st room from north at east located at apt b45, 4th story, 1st apartment from north at eastCiv14 mailed
Aug 29, 2022Section 27-2026 adm code repair the broken or defective connection at waste line wash basin in the bathroom located at apt 26a, 2nd story, 1st apartment from south at westInvalid certification
Jan 31, 2020Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint east & west fire escapes at building frontNot complied with
Jan 21, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th storyNot complied with
Mar 25, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Mar 25, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Nov 09, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at the bulkhead ceiling , section ''south '', at southwestNov sent out
Nov 09, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at the bulhead ceiling and all wallls , 6th story, section ''south ''Nov sent out
Sep 28, 2018Section 27-2011 adm code cleanse to the satisfaction of this department the center east section at public hall, 1st storyNov sent out
Sep 28, 2018Section 27-2005 adm code replace with new the missing safety plastic caps or covers for electric outlet at north wall at public hall, 1st story, section at northNov sent out
Aug 28, 2018Section 27-2005 adm code refit door in the entrance located at apt b62, 6th story, 3rd apartment from north at east , section ''b section''Nov sent out
Jun 04, 2018Section 27-2005, 2007 adm code remove device preventing door from being self-closing on the fire doors at public hall, 5th story, section at southNov sent out
Dec 14, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east, the 1st room from east at north, the bathroom located at apt a51, 5th story, 1st apartment from south at westNot complied with