Apr 11, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 24, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 01, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Oct 19, 2021Section 27-2005 adm code refit vestibule door at public hall, 1st storyNov sent out
Apr 12, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Nov 17, 2016Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency''s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st storyNov sent out
Mar 20, 2015Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the bathroom located at apt b1, 2nd story, 1st apartment from north at eastNov sent out
Mar 20, 2015Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt b1, 2nd story, 1st apartment from north at eastNov sent out
Mar 20, 2015Section 27-2005 adm code properly repair with similar material the broken or defective cermamic tile grout at the north wall in the kitchen located at apt b1, 2nd story, 1st apartment from north at eastNov sent out
Mar 20, 2015Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the 1st room from east at south located at apt b1, 2nd story, 1st apartment from north at eastNov sent out
May 30, 2014Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt c1, 3rd story, apartment at eastNov sent out
May 30, 2014Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak around window frame in the 1st room from east at north located at apt c1, 3rd story, apartment at eastNov sent out
May 30, 2014Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak around window frame in the 1st room from east at south located at apt c1, 3rd story, apartment at eastNov sent out
May 30, 2014Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartment located at apt c1, 3rd story, apartment at eastNov sent out
May 30, 2014Section 27-2005 adm code properly repair the broken or defective wooden floor at or near radiator in the entire apartment located at apt c1, 3rd story, apartment at eastNov sent out