1781 East 16 Street,Brooklyn, NY 11229

19 Units

Built in 1925

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
56 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 55 violations which is 2.89 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
31Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
9Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jul 16, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt c5, 3rd story, 2nd apartment from north at eastNov sent out
Jul 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and south wall in the 3rd room from east located at apt c5, 3rd story, 2nd apartment from north at eastNov sent out
Jul 16, 2023§ 27-2026 adm code repair leaky water closet flush pipe connection in the bathroom located at apt c5, 3rd story, 2nd apartment from north at eastNov sent out
Jul 16, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt c5, 3rd story, 2nd apartment from north at eastNov sent out
Jul 16, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser pipe in the bathroom located at apt c5, 3rd story, 2nd apartment from north at eastNov sent out
Jan 02, 2019Section 27-2005 adm code refit . . . in the entrance located at apt b2, 2nd story, 2nd apartment from south at westNot complied with
Jan 02, 2019Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt b2, 2nd story, 2nd apartment from south at westNot complied with
May 15, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 1c, 3rd story, 1st apartment from south at westNov sent out
May 15, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 2nd room from east located at apt 1c, 3rd story, apartment at westNov sent out
May 15, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 3rd room from east located at apt 1c, 3rd storyNov sent out
May 15, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 1c, 3rd story, apartment at westNov sent out
Jan 17, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the kitchen located at apt b3, 2nd story, 1st apartment from west at northNot complied with
Nov 27, 2017Section 27-2043 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also missing door chain guard in the entrance located at apt a2, 1st story, apartment at northNot complied with
Sep 14, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceiling in the entire apartment located at apt c1, 3rd story, 1st apartment from south at westNov sent out
Sep 14, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the entire apartment located at apt c1, 3rd story, 1st apartment from south at westNov sent out

Property Owners and Associates

Abdurrab Khan
Head Officer
1.5(1)

1 Property

19 Units

Five Boro Management, Inc
Agent
1.5(1)

1 Property

19 Units

Kings & East 16th Street LLC
Corporate Owner
1.5(1)

1 Property

19 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Beware of this building.
Former Tenant
Pros:
Close to the subway
Cons:
Building is poorly maintained. There (c) openig...
Advice to owner:
You really need to invest and fix all the probl...