Sep 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department , 1st door from north at east wall, west wall, west wall, 1st door from north at east wall, west wall, 1st door from north at east wall, west wall, 1st door from north at east wall in the bathroom located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Sep 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 3rd room from east at north, the 3rd room from east at south, the private hallway , the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at westNov sent out
Oct 27, 2022Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint north and south stacks at building rear east fire escapes, all stories , section ''2855''Nov sent out
Aug 04, 2021Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all partsall stories balconies stacks at the front of the building at fire escapeNot complied with
May 23, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency's housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Feb 22, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency's housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Jan 17, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNot complied with
Jan 16, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation 1st door frame from east at south wall in the foyer located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Jan 16, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the 3rd room from east located at apt 1b, 1st story, 1st apartment from west at northNov sent out
May 24, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings at all stories at public hallNot complied with