Jul 29, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation the lower cabinet at south wall in the kitchen located at apt 1fl, 1st story, 1st apartment from east at southNov sent out
Jun 21, 2019Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1fl, 1st story, apartment at southNov sent out
Jun 21, 2019Section 27-2005 admin. code: properly repair the broken or defective door bell in the foyer located at apt 1fl, 1st story, apartment at southNov sent out
Mar 29, 2019Section 27-2010, 2011, 2012 admin code: cleanse to the satisfaction of this department the mold around ceramic tiles and shower stall base in the bathroom located at apt ground, 2nd storyNov sent out
Mar 29, 2019Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department ceilings, walls and closets throughout in the entire apartment located at apt ground, 2nd storyNov sent out
Sep 12, 2018Section 27-2005 admin. code: properly repair the broken or defective door bell in the entrance located at apt pvt, 1st storyNov sent out
Aug 20, 2018Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department .. in the entire apartment located at apt ph, 1st story, apartment at southNov sent out
Aug 20, 2018Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling and all walls in the foyer located at apt ph, 1st storyNov sent out
Aug 20, 2018Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color all walls in the 2nd room from east located at apt ph, 1st story, apartment at southNov sent out
Aug 20, 2018Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color south and west walls in the private hallway located at apt ph, 2nd story, apartment at southNov sent out
Aug 20, 2018Section 27-2005 admin. code: properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt ph, 1st story, apartment at southNov sent out
Aug 20, 2018Section 27-2005 admin. code: properly repair the broken or defective electrical light switch at east wall in the 2nd room from east located at apt ph, 1st story, apartment at southNov sent out
Aug 20, 2018Section 27-2005 admin. code: refit the door in the entrance located at apt ph, 1st story, apartment at southNov sent out
Jun 06, 2018Section 27-2026 admin. code: replace the broken or defective faucet at sink in the kitchen located at apt 1, 1st story, 1st apartment from east at southNov sent out
Jun 06, 2018Section 27-2005 admin. code: properly repair the broken or defective lower widow panes in the 1st room from north at west located at apt 1, 2nd story, 1st apartment from east at southNov sent out
Jun 06, 2018Section 27-2005 admin. code: properly repair the broken or defective lower window counter balance in the entire apartment located at apt 1, 1st story, 1st apartment from east at southNov sent out
Jun 06, 2018Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings in the entire apartment located at apt 1, 1st story, 1st apartment from east at southNov sent out
Dec 09, 2017Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 1, 2nd storyNov sent out