9 Paerdegat 14 Street,Brooklyn, NY 11236

3 Units

Built in 1965

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
5 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 98 violations which is 32.66 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
63Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
12Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 11, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 24, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 01, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 12, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jun 19, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at northNov sent out
Jun 18, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department door in the 1st room from east at north located at apt 1, 1st storyNov sent out
May 14, 2019Section 27-2005 adm code refit entrance door in the 1st room from north at east located at apt 3rdfl, 2nd story, 1st apartment from south at westNov sent out
May 13, 2019Section 27-2005 adm code refit entrance door to room in the 1st room from north located at apt 3flr, 3rd story, 1st apartment from south at westNov sent out
May 13, 2019Section 27-2005 adm code properly repair the broken or defective mailbox at building frontNov sent out
May 09, 2019Section 27-2026 adm code repair leaky water closet flush pipe connection .. in the bathroom located at apt 3rdfl, 2nd story, 1st apartment from south at westNov sent out
May 09, 2019Section 27-2026 adm code replace with new the defective flush pipe of water closet ... in the bathroom located at apt 3rdfl, 2nd story, 1st apartment from south at westNov sent out
Apr 24, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st storyNov sent out
Apr 24, 2019Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box, 1st storyNov sent out
Apr 24, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st storyNov sent out
Apr 24, 2019Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st storyNov sent out
Apr 24, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st storyNov sent out
Apr 24, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Apr 20, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 2nd storyNov sent out
Apr 20, 2019Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 2nd storyNov sent out
Apr 20, 2019Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing , 2nd storyNov sent out
Apr 20, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 2nd storyNov sent out
Apr 20, 2019Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 2nd storyNov sent out
Apr 20, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out

Property Owners and Associates

Abdul, Kemi
Owner
0(0)

1 Property

3 Units

Bakre Abdul
Site Manager, Joint Owner, Head Officer
0(0)

1 Property

3 Units

Kemi Abdul
Agent, Joint Owner, Officer
0(0)

1 Property

3 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet