794 Midwood Street,Brooklyn, NY 11203

48 Units

Built in 1953

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
175 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 69 violations which is 1.43 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
8Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
49Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
12Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 12, 2022Section 27-2005 adm code refit the closet door in the 3rd room from north located at apt 5e, 5th story, 2nd apartment from north at eastCiv14 mailed
Feb 12, 2022Section 27-2005 adm code properly repair with similar material the broken or defective caulking around wash basin in the bathroom located at apt 5e, 5th story, 2nd apartment from north at eastCiv14 mailed
Feb 12, 2022Section 27-2005 adm code replace with new the missing strike plate at entrance door frame in the bathroom located at apt 5e, 5th story, 2nd apartment from north at eastCiv14 mailed
Mar 13, 2020§ 27-2005 adm code refit lower sash of window at west wall in the 3rd room from north located at apt 5g, 5th story, 1st apartment from west at northViolation will be reinspected
Dec 23, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 5g, 5th story, 1st apartment from west at northViolation will be reinspected
Jul 23, 2019§ 27-2005 adm code properly secure the loose moldings at the window in the kitchen located at apt 5g, 5th story, 1st apartment from west at northViolation will be reinspected
Jul 23, 2019§ 27-2005 adm code properly repair with similar material the broken or defective wood flooring in the kitchen located at apt 5g, 5th story, 1st apartment from west at northViolation will be reinspected
Jan 05, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department .. in the entire apartment located at apt 5g, 5th storyViolation will be reinspected

Property Owners and Associates

Aviance Carrington
Site Manager, Officer
0(0)

3 Properties

144 Units

Carl Willis
Site Manager
0(0)

3 Properties

144 Units

Harry Silver Housing Company, Inc.
Corporate Owner
0(0)

3 Properties

144 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet