15 Dwight Street,Brooklyn, NY 11231

Built in 1972

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
145 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 110 violations which is 0 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
26Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
76Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
7Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Nov 03, 2021Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 15a, 1st story, 1st apartment from south at westNov sent out
Nov 03, 2021Section 27-2005 admin. code: refit closet doors at west wall in the 1st room from east located at apt 15a, 1st story, 1st apartment from south at westNov sent out
Nov 03, 2021Section 27-2005 admin. code: refit door to boiler room at south wall in the private hallway located at apt 15a, 1st story, 1st apartment from south at westNov sent out
Oct 31, 2021Section 27-2005 admin. code: properly secure the loose watercloset in the 1st bathroom from north at west located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 28, 2021Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 1, 1st story, 1st apartment from east at southNov sent out
Oct 28, 2021Section 27-2005 admin. code: provide missing outlet cover in the 2nd bathroom from north at west located at apt 1, 1st story, 1st apartment from east at southNov sent out
Jul 14, 2020Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt ph mid level, 1st storyNov sent out
Jul 14, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the bathroom located at apt ph mid level, 1st storyNov sent out
Jul 14, 2020Section 27-2064 adm code - provide in accordance with the rules and regulations of this department a waterproof floor and base for the water closet ... in the bathroom located at apt ph mid level, 1st storyNov sent out
Jul 14, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls in the private hallway located at apt ph upper level, 1st storyNov sent out
Jul 14, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt ph upper level, 1st storyNov sent out
Jul 14, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling and south wall in the bathroom located at apt ph upper level, 3rd storyNov sent out
Jul 14, 2020Section 27-2005 admin. code: properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt ph upper level, 3rd storyNov sent out
Jul 10, 2020Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt ph mid level, 2nd storyNov sent out
Jul 10, 2020Section 27-2005 admin. code: properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt ph lower level, 1st storyNov sent out
Jul 10, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt ph lower level, 1st storyNov sent out
Jul 10, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt ph lower level, 1st storyNov sent out
Jul 10, 2020Section 27-2005 admin. code: properly secure the loose handrail at west wall at intermediate landing located at apt ph mid level, 1st storyNov sent out
Jul 10, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls in the 1st room from east at north located at apt ph lower level, 1st storyNov sent out
Jul 10, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the west wall at intermediate landing located at apt ph lower level, 1st storyNov sent out
Jul 10, 2020Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt ph mid level, 1st storyNov sent out
Jul 10, 2020Section 27-2005 admin. code: repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt ph mid level, 1st storyNov sent out
Jul 10, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the door at entrance (exterior side) in the 1st room from east at south located at apt ph mid level, 1st storyNov sent out
Jul 10, 2020Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the door at entrance (exterior side) in the 2nd room from east at south located at apt ph mid level, 1st storyNov sent out
Jul 22, 2015Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 15b, 2nd storyNov sent out
Jul 22, 2015Section 27-2005 admin. code: refit windows in the entire apartment located at apt 15b, 2nd storyNov sent out

Property Owners and Associates

Cynthia Gonzalez
Head Officer, Officer
1.1(1)

38 Properties

129 Units

Grc Management
Agent
3.7(39)

99 Properties

3081 Units

Red Hook Gardens Housing Development Fun D Corp
Owner
0(0)

5 Properties

8 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet