Apr 24, 2024§ 27-2026 adm code repair the broken or defective connection at wasteline at wash basin in the bathroom located at apt 6a, 6th story, 2nd apartment from west at northNov sent out
Apr 24, 2024§ 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 6a, 6th story, 2nd apartment from west at northNov sent out
Apr 24, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6a, 6th story, 2nd apartment from west at northNov sent out
Apr 24, 2024§ 27-2005 hmc: properly repair or replace the broken or defective door knob in the 2nd room from east located at apt 6c, 6th story, 3rd apartment from east at southNov sent out
Apr 24, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood cabinet at sink in the kitchen located at apt 6c, 6th story, 3rd apartment from east at southNov sent out
Mar 30, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and south wall in the private hallway located at apt 3f, 3rd story, 3rd apartment from south at westNov sent out
Feb 24, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color east & west walls in the bathroom located at apt 6c, 6th story, 3rd apartment from east at southNov sent out
Feb 24, 2021Section 27-2005 adm code properly repair the broken or defective intercom system in the foyer located at apt 6c, 6th story, 3rd apartment from east at southNov sent out
Feb 24, 2021Section 27-2005 adm code properly secure the loose wash basin to wall in the bathroom located at apt 6c, 6th story, 3rd apartment from east at southNov sent out