43-34 49 Street,Queens, NY 11104

72 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
101 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 119 violations which is 1.65 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
35Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
59Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
25Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 01, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNov sent out
Apr 01, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNov sent out
Apr 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 square feet at north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNotice of issuance sent to tenant
Apr 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 4th room from east located at apt 6l, 6th story, 2nd apartment from south at westNov sent out
Mar 30, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the 3rd room from north located at apt 1g, 1st story, 2nd apartment from north at eastNov sent out
Mar 26, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at north wall molding north wall in the 1st room from north located at apt 1g, 1st story, 2nd apartment from north at eastNov sent out
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the foyer , the private hallway located at apt 1g, 1st story, 2nd apartment from north at east , section at southNov sent out
Mar 10, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... consisting of approximately 3 square feet at ceiling in the bathroom located at apt 4f, 4th story, 3rd apartment from south at westNotice of issuance sent to tenant
Mar 10, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east wall in the bathroom located at apt 4f, 4th story, 3rd apartment from south at westNov sent out
Mar 02, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNov sent out
Feb 15, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder , ''missing'' at south stack at building front at fire escapeNov certified on time
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th storyNov certified on time
Feb 09, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape from north at west at fire escapeNov certified on time
Jan 26, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at 2nd stack from north at building east at fire escape, 2nd storyNov sent out
Jan 24, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Jan 24, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall and north walls in the 1st room from east at south located at apt 4g, 4th story, 4th apartment from north at eastNov sent out
Jan 24, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 1st stack at east, building front at fire escapeNov certified on time
Jan 19, 2024§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyNov sent out
Jan 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling at public hall, 6th storyNov sent out
Jan 14, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at 1st fire escape from south at east building front at fire escapeNov certified on time
Jan 14, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westCiv14 mailed
Jan 14, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 6l, 6th story, 2nd apartment from south at westNot complied with
Jan 10, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department , east wall, west wall, 1st closet from south at west wall door frame in the private hallway located at apt 1g, 1st story, 2nd apartment from south at westNot complied with
Oct 23, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at west 2 closet in the 1st room from north located at apt 6f, 6th story, 3rd apartment from north at eastCiv14 mailed
Mar 30, 2023Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder missing 1st at east at fire escapeNov sent out
Mar 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at baseboard at west wall in the foyer located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Mar 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door, ceiling in the private hallway located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Mar 15, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation at 1st door frame from south at west wall, 1st door frame from west at north wall in the private hallway located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Mar 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at east located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Mar 15, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation at 1st window frame from west at north wall in the 1st room from north at east located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Mar 15, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west located at apt .1a, 1st story, 1st apartment from west at northNov sent out
Feb 14, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the private hallway located at apt 1g, 1st storyNov sent out
Sep 02, 2020Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint centre fire escape at building frontNov sent out
Mar 10, 2020Section 27-2011 adm code cleanse to the satisfaction of this department the the ceiling in the bathroom located at apt 4e, 4th story, 2nd apartment from north at eastNov sent out
Mar 10, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at north located at apt 4e, 4th story, 2nd apartment from north at eastNov sent out

Property Owners and Associates

Barry Rudofsky
Head Officer
3(121)

124 Properties

5237 Units

Bronstein Properties, LLC
Agent
3(94)

125 Properties

5430 Units

Carlos Palma
Site Manager
4.6(1)

1 Property

72 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Nice quiet area
Former Tenant
Pros:
Quiet neighborhood, great super, clean (c) open...
Cons:
Heat doesn't work great- I (c) openigloo used a...
Advice to owner:
Seal the windows!