May 03, 2022Section 27-2005 adm code properly repair the broken or defective sliding door at closet in the 1st room from north located at apt 18, 4th story, 2nd apartment from south at westNov sent out
May 03, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam pipe heat riser in the 2nd room from north located at apt 18, 4th story, 2nd apartment from south at westNov sent out
May 03, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam pipe heat riser in the bathroom located at apt 18, 4th story, 2nd apartment from south at westNov sent out
May 03, 2022Section 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 18, 4th story, 2nd apartment from south at westNov sent out
May 03, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceilings and all walls throughout in the entire apartment located at apt 18, 4th story, 2nd apartment from south at westNov sent out
Mar 08, 2022Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Mar 08, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out