Nov 02, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at basement at section east at public hallNov sent out
Nov 02, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall at basement at section west at public hallNov sent out
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling at 1st, 2nd, 3rd, 4th , 5th and 6th stories at fire stairs, section at northNov sent out
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling at 1st, 2nd, 3rd, 4th , 5th and 6th stories at fire stairsNov sent out
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling at 1st, 2nd, 3rd, 4th , 5th and 6th stories at public hall, section at northNov sent out
Oct 12, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling at 1st, 2nd, 3rd, 4th , 5th and 6th stories at public hall, section at southNov sent out
Sep 06, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 4m, 4th story, 2nd apartment from east at southNot complied with
Aug 17, 2022Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling ( 5 sq ft ) in the bathroom located at apt 4c, 4th story, 1st apartment from north at east , section at westFirst no access to re- inspect violation
Aug 17, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from north at east , section at westFirst no access to re- inspect violation
Aug 11, 2022Section 27-2005 adm code refit fire door at cellar entrance stry at fire stairs, section ''a''Not complied with
Aug 11, 2022Section 27-2005 adm code refit at cellar entrance story at fire stairs, section ''b''Not complied with
Mar 23, 2022Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency's housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hallNot complied with
Mar 23, 2022Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hallNot complied with
Mar 23, 2022Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hallNot complied with
Mar 23, 2022Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Not complied with
Mar 23, 2022Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hallNot complied with
Sep 07, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department north/east wall at west exit basement hallway leads to rear yardNot complied with