143-40 Roosevelt Avenue,Queens, NY 11354

91 Units

Built in 1962

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
12 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 34 violations which is 0.37 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
20Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
0Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Dec 13, 2019Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles at east wall in the bathroom located at apt 3f, 3rd story, 3rd apartment from north at eastNov sent out
Dec 06, 2018Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov certified late
Dec 06, 2018Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov certified late
Dec 06, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov certified late
Jun 07, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby, 1st storyNov sent out
Jun 07, 2018Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st storyNov sent out
Sep 30, 2017Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at west , south , and southwest fire escapesNov sent out
Sep 30, 2017Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Mar 20, 2017Section 27-2005 adm code refit the north window in the 1st room from east at south located at apt 7g, 6th story, 2nd apartment from north at eastNov sent out
Mar 20, 2017Section 27-2026 adm code repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 7g, 6th story, 2nd apartment from north at eastNov sent out
Mar 20, 2017Section 27-2026 adm code repair leaky water closet flush pipe connection .. in the bathroom located at apt 7g, 6th story, 2nd apartment from north at eastNov sent out
Mar 20, 2017Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at the north wall in the bathroom located at apt 7g, 6th story, 2nd apartment from north at eastNov sent out
Mar 08, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling ( mark 7 story) at public hall, 6th storyNov sent out
Oct 02, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling 2nd story public hallNov sent out

Property Owners and Associates

Blair House Owners Corp
Owner, Corporate Owner
0(0)

3 Properties

358 Units

Carlos Rivera
Site Manager
0(0)

1 Property

91 Units

Mark Yang Lan
Officer
0(0)

3 Properties

358 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet