Oct 02, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at southFirst no access to re- inspect violation
Oct 02, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling & west wall in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at southFirst no access to re- inspect violation
Oct 02, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3c, 3rd story, 3rd apartment from east at southFirst no access to re- inspect violation
Oct 02, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the private hallway located at apt 3c, 3rd story, 3rd apartment from east at southFirst no access to re- inspect violation
Oct 02, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at southFirst no access to re- inspect violation
Oct 02, 2018Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with