114-05 170 Street,Queens, NY 11434

77 Units

Built in 1966

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
376 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 179 violations which is 2.32 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
56Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
82Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
41Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 25, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelin enamel glaze at bathtub in the bathroom located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Feb 25, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the private hallway located at apt 4p, 4th story, 4th apartment from north at eastCiv14 mailed
Feb 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall at public hall, 6th storyNov sent out
Feb 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall in the kitchen located at apt 1m, 1st story, 2nd apartment from north at eastCiv14 mailed
Feb 03, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq.ft at south wall in the 3rd room from north located at apt 1c, 1st story, 7th apartment from north at eastNotice of issuance sent to tenant
Jan 31, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and walls in the 3rd room from north located at apt 3c , 3rd storyNov sent out
Jan 31, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall in the 2nd room from north at east located at apt 3c , 3rd storyNov sent out
Jan 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Nov 30, 2023§ 27-2005 adm code properly secure the loose sliding door on track at west wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from north at eastNov sent out
Oct 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and east wall in the bathroom located at apt 5k, 5th story, 6th apartment from south at westNov sent out
Oct 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 5k, 5th story, 6th apartment from south at westNov sent out
Oct 15, 2023§ 27-2005 hmc: properly repair or replace the broken or defective counter balance at lower sash at west 1 window in the 1st room from north located at apt 5k, 5th story, 6th apartment from south at westNov sent out
Oct 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 5k, 5th story, 6th apartment from south at westNov sent out
Oct 14, 2023§ 27-2005 adm code properly secure the loose base cabinet doors in the kitchen located at apt 5k, 5th story, 6th apartment from south at westNov sent out
Sep 18, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Sep 18, 2023§ 27-2005 hmc: properly repair or replace the broken or defective electric fixtures at ceiling in the private hallway located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Sep 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 3k, 3rd story, 6th apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 hmc: properly repair or replace the broken or defective rubber gasket seal at refrigerator door in the kitchen located at apt 3k, 3rd story, 6th apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 hmc: properly repair or replace the broken or defective formica countertop and base cabinet at sink in the kitchen located at apt 3k, 3rd story, 6th apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6k, 6th story, 3rd apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 6k, 6th story, 3rd apartment from south at westNov sent out
Aug 29, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 5th room from east at south located at apt 6k, 6th story, 3rd apartment from south at westNov sent out
Aug 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceilings and all walls throughout in the entire apartment located at apt 1d, 1st story, 1st apartment from east at southNov sent out
Aug 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceilings and all walls throughout in the entire apartment located at apt 3k, 3rd story, 6th apartment from south at westNov sent out
Aug 08, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from east at southNov sent out
Aug 08, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from east at southNov sent out
Aug 08, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2m, 2nd story, 2nd apartment from north at eastNov sent out
Aug 08, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2m, 2nd story, 2nd apartment from north at eastNov sent out
Jun 14, 2023Section 27-2026 adm code repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5c, 5th story, 7th apartment from north at eastNov sent out
Jun 14, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 5c, 5th story, 7th apartment from north at eastNov sent out
Jun 14, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 5c, 5th story, 7th apartment from north at eastNov sent out
May 03, 2023Section 27-2005 hmc: properly repair or replace the broken or defective door at sink base cabinet in the kitchen located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Apr 19, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east located at apt 1k, 1st story, 5th apartment from south at westNov sent out
Apr 19, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east at north located at apt 1k, 1st story, 5th apartment from south at westNov sent out
Apr 19, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color south and east wall in the 3rd room from east at north located at apt 1k, 1st story, 5th apartment from south at westNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Mar 01, 2023Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 5e, 5th story, 1st apartment from south at westNov sent out
Mar 01, 2023Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Mar 01, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Mar 01, 2023Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Jan 03, 2023Section 27-2005 adm code properly repair with similar material the broken or defective wood panel at floor inside base cabinet in the kitchen located at apt 4a, 4th story, 5th apartment from north at eastNov sent out
Jul 02, 2022Section 27-2005 adm code refit doors at closet in the 3rd room from north located at apt 1g, 1st story, 3rd apartment from south at westNov sent out
Jun 13, 2022Section 27-2005 adm code properly repair the broken or defective closet door in the 2nd room from north at east located at apt 5c, 5th story, 6th apartment from north at eastNov sent out
Jun 13, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilnceilings, mouldings and doors in the entire apartment located at apt 5c, 5th story, 6th apartment from north at eastNov sent out
Jun 13, 2022Section 27-2005 adm code refit entry door in the 1st room from north at east located at apt 5c, 5th story, 6th apartment from north at eastNov sent out
Jun 13, 2022Section 27-2005 adm code properly repair the broken or defective loose handle at bathtub in the bathroom located at apt 5c, 5th story, 6th apartment from north at eastNov sent out
Apr 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings, and doors in the entire apartment located at apt 4e, 4th story, 1st apartment from south at westNov sent out
Apr 15, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings, and doors in the entire apartment located at apt 4p, 4th story, 4th apartment from north at eastNov sent out
Feb 16, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north located at apt 1c, 1st story, 3rd apartment from north at east , section ''south''Nov sent out
Feb 08, 2022Section 27-2005 adm code properly repair the broken or defective drawer of sink base cabinet in the kitchen located at apt 5e, 5th story, 1st apartment from south at westNot complied with
Aug 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 4m, 4th story, 2nd apartment from north at eastNot complied with
Jun 02, 2021§ 27-2005 adm code properly secure the loose ceiling light fixture at foyer located at apt 6k, 6th story, 3rd apartment from south at westSecond no access to re-inspect violation
Dec 23, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2k, 2nd story, 6th apartment from south at westNot complied with
Nov 25, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 6m, 6th story, 2nd apartment from north at eastNot complied with

Property Owners and Associates

Aja Jusino
Site Manager
3.8(2)

1 Property

77 Units

Albans Housing Development Fund Corporat Ion
Owner
3.8(2)

1 Property

77 Units

John Crotty
Head Officer
2.7(5)

79 Properties

1196 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Long time ago
Former Tenant
Pros:
The superintendent and landlord were (c) openig...
Cons:
Leaking bathroom ceiling. Hole in (c) openigloo...
Living here
Former Tenant
Pros:
I like the fact that (c) openigloo maintenance ...
Cons:
People in this building are (c) openigloo loud ...
Advice to owner:
Get it together or lose alot of tenants