Aug 16, 2018Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt second, 2nd storyNov sent out
Aug 16, 2018Section 27-2005 admin. code: refit door to 2nd story balcony in the 4th room from east at north located at apt second, 2nd storyNov sent out
Aug 13, 2018Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department window frame in the bathroom located at apt 2, 2nd storyNov sent out
Aug 13, 2018Section 27-2005 admin. code: properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 2, 2nd storyNov sent out
Aug 13, 2018Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out