22-88 Mott Avenue,Queens, NY 11691

60 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
492 complaints
See all 311 complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 368 violations which is 6.13 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
39Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
229Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
99Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Feb 07, 2024§27-2153 adm code post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. postNov sent out
Jul 21, 2023§ 27-2005 adm code remove the broken or defective flooring and pave the floor with 4 inches of concrete south west (section) at cellarNov sent out
Jul 21, 2023§ 27-2026 adm code remove disused plumbing fixtures and properly seal pipe connections water closet wash basin and showerstall at cellar, section at eastNov sent out
Jul 02, 2023§ 27-2005 hmc: properly repair or replace the broken or defective upper sash window at east wall in the kitchen located at apt 5c, 5th story, 2nd apartment from north at eastNot complied with
Jul 02, 2023§ 27-2005 hmc: properly repair or replace the broken or defective upper sash window at east wall in the 1st room from north at east located at apt 5c, 5th story, 2nd apartment from north at eastNot complied with
Jul 01, 2023§ 27-2005 adm code properly secure the loose counter top in the kitchen located at apt 5c, 5th story, 2nd apartment from north at eastNot complied with
Jun 19, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at heat riser in the bathroom located at apt 6e, 6th story, 1st apartment from east at south , section at westNov sent out
Jun 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north located at apt 6e, 6th story, 2nd apartment from west at northNov sent out
Jun 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, west wall in the bathroom located at apt 6e, 6th story, 2nd apartment from west at northNov sent out
Jun 01, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''First no access to re- inspect violation
May 19, 2023§ 27-2005 hmc: refit ,door in the bathroom located at apt 2f, 2nd story, 1st apartment from west at northNov sent out
May 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story, section at eastNov sent out
May 16, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 5g, 5th story, 2nd apartment from south at westNov sent out
May 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at bulkhead at roof , section at eastNov sent out
May 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls at bulkhead at roof , section at westNov sent out
Apr 20, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at 2nd stack from east at building rear at fire escapeNot complied with
Apr 20, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at 3rd stack from east at building rear at fire escapeNot complied with
Apr 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story, section ''east''Not complied with
Apr 20, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st storyNot complied with
Apr 14, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls throughout in the entire apartment located at apt 2h, 2nd story, 1st apartment from south at west , section ''west''First no access to re- inspect violation
Apr 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 6m, 6th story, 1st apartment from east at south , section ''west''Not complied with
Apr 10, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6f, 6th story, 1st apartment from west at north , section ''west''First no access to re- inspect violation
Dec 25, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5m, 5th story, 1st apartment from east at south , section ''west''First no access to re- inspect violation
Nov 03, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''First no access to re- inspect violation
Oct 12, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 2nd door from south at west wall in the 2nd room from north at west located at apt 2a, 2nd story, 2nd apartment from east at southNot complied with
Oct 12, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from north located at apt 1f, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 12, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak north wall in the 3rd room from north located at apt 1f, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 12, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 4a, 4th story, 2nd apartment from east at southFirst no access to re- inspect violation
Sep 29, 2022§ 27-2005 adm code refit metal door at east fire passage way, front of buildingNot complied with
Jul 08, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls. in the kitchen located at apt 4c, 5th story, 2nd apartment from north at east , section ''east''Not complied with
Jun 28, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 5g, 5th story, 2nd apartment from south at westNot complied with
Jun 28, 2022§ 27-2011 adm code cleanse to the satisfaction of this department the mildew at ceramic tiles at all walls in the bathroom located at apt 1k, 1st story, 4th apartment from east at southFirst no access to re- inspect violation
May 16, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 4d, 4th story, 1st apartment from north at eastNot complied with
May 16, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 4d, 4th story, 1st apartment from north at eastNot complied with
Apr 04, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4a, 4th story, 2nd apartment from east at southFirst no access to re- inspect violation
Mar 14, 2022§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at center stack building rear at fire escapeNot complied with
Mar 14, 2022§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at west stack building rear at fire escapeNot complied with
Oct 24, 2019§ 27-2005 adm code refit lower & upper window sashes in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north , section ''west''Not complied with
Apr 19, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 5e, 5th story, 1st apartment from west at north , section ''east''Not complied with

Property Owners and Associates

Aaron Lowinger
Site Manager
1.4(1)

1 Property

60 Units

Dutch Country Realty LLC
Corporate Owner
1.4(1)

8 Properties

158 Units

Gershon Eichorn
Head Officer
1.4(1)

9 Properties

182 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Horrible nasty building
Former Tenant
Pros:
The 1 bedroom living room (c) openigloo is spac...
Cons:
Pest mold lead
Advice to owner:
Fix the apartment