Jun 05, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east, the 1st room from east at north, the 2nd room from east at north, the kitchen located at apt rear1s, 1st story, 1st apartment from east at southNov sent out
Jan 03, 2019Section 27-2005 admin. code: refit all window sashes in the entire apartment located at apt 1, 1st story, 1st apartment from east at southNov sent out
Jan 03, 2019Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Aug 10, 2018Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at northNov sent out