60-10 47 Avenue,Queens, NY 11377

140 Units

Built in 1964

18 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
218 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 31 violations which is 0.22 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
12Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
5Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jun 24, 2021§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Apr 19, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the entire apartment located at apt 9h, 9th story, 2nd apartment from south at westNov sent out
Sep 09, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 9h, 9th story, 2nd apartment from south at westInvalid certification
Mar 11, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall in the foyer located at apt 9h, 9th story, 2nd apartment from south at westNov sent out
Jun 14, 2019§ 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box locked , 1st storyNot complied with
Jun 14, 2019§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNot complied with
Jun 05, 2019Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from north located at apt 9h, 9th story, 2nd apartment from west at northNov sent out
Jun 05, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st bathroom from north located at apt 9h, 9th story, 2nd apartment from west at northNov sent out
Jun 05, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall near gas range in the kitchen located at apt 9h, 9th story, 2nd apartment from west at northNov sent out
Jun 05, 2019§ 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at vestibule at public hall, 1st storyNot complied with
May 09, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and the east wall in the bathroom located at apt 6g, 6th story, 1st apartment from south at westFirst no access to re- inspect violation
May 09, 2019§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 6g, 6th story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 13, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 9h, 9th story, 2nd apartment from south at westNov sent out
Jun 13, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from east located at apt 9h, 9th story, 2nd apartment from south at westNov sent out

Property Owners and Associates

Big Six Towers Inc
Owner, Corporate Owner
0(0)

11 Properties

1528 Units

Brevard Owners, Inc
Owner, Corporate Owner
3.8(9)

14 Properties

2172 Units

Eileen Shields
Owner, Corporate Owner
3.8(220)

521 Properties

38413 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet