260 Park Hill Avenue,Staten Island, NY 10304

132 Units

Built in 1968

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 383 violations which is 2.9 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
79Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
188Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
115Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east, west and north wall in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at westNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wal in the bathroom located at apt 3w, 3rd story, 1st apartment from west at northNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at northNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east and south wall in the bathroom located at apt 4n, 4th story, 1st apartment from east at southNov sent out
Mar 06, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling apprx 2 sq,ft in the bathroom located at apt 2m, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Mar 06, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling apprx 4 sq,ft, in the bathroom located at apt 2l, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Mar 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls in the 1st room from east at south located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Feb 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at east wall apprx 8 sq,ft. in the 1st room from east at south located at apt 1h, 1st story, 1st apartment from north at east , section at northDefect letter issued
Feb 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at south wall 4 sq,ft. in the 1st room from east at south located at apt 1h, 1st story, 1st apartment from north at east , section at northDefect letter issued
Feb 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall apprx 6 square feet in the bathroom located at apt 1h, 1st story, 1st apartment from north at east , section at northDefect letter issued
Feb 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling 6 sq,ft, at public hallDefect letter issued
Feb 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls in the 1st room from east at south located at apt 5p, 5th story, 2nd apartment from north at east , section at southFirst no access to re- inspect violation
Feb 06, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls in the 1st room from east at north located at apt 5p, 5th story, 2nd apartment from north at east , section at southFirst no access to re- inspect violation
Jan 29, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3w, 3rd story, 1st apartment from west at northNot complied with
Jan 29, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south located at apt 3w, 3rd story, 1st apartment from west at northNot complied with
Jan 24, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north window frame (approx 2 sq ft) in the bathroom located at apt 1h, 1st story, 1st apartment from north at eastDefect letter issued
Jan 04, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... 2 sq.ft. ceiling in the bathroom located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Jan 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the kitchen located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Jan 04, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 3rd room from east at south, the private hallway located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Nov 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 3rd room from north at east, the foyer , the private hallway , the bathroom , the 1st room from north located at apt 1t, 1st story, 1st apartment from south at westNot complied with
Nov 22, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1t, 1st story, 1st apartment from south at westNot complied with
Oct 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from east at south, the 3rd room from east at south, the foyer , the 2nd room from east at south, the 1st room from east at north, the 4th room from east at north, the bathroom located at apt 2w, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 3rd room from east at south, the 2nd room from east, the bathroom , the foyer located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Sep 21, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the private hallway , the 1st room from north at west, the bathroom located at apt 2n, 2nd story, 1st apartment from west at northNot complied with
Sep 14, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 3rd room from north at west, the kitchen , the 1st room from north at west located at apt 3u, 3rd story, 2nd apartment from south at westFirst no access to re- inspect violation
Sep 01, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at north, the 4th room from east at south, the foyer , the 1st room from east at south, the bathroom , the 4th room from east at north located at apt 3w, 3rd story, 1st apartment from west at northNot complied with
Aug 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east at south, the kitchen , the 4th room from east at north located at apt 3w, 3rd story, 1st apartment from west at northNot complied with
Jul 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 2w, 2nd story, 1st apartment from west at north , section ''south''First no access to re- inspect violation
Jul 28, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 2w, 2nd story, 1st apartment from west at north , section ''south''First no access to re- inspect violation
Jul 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the bathroom located at apt 4k, 4th story, 1st apartment from east at south , section ''north''First no access to re- inspect violation
Jul 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Jun 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north , section ''north''Not complied with
Jun 29, 2023§ 27-2005 adm code properly secure the loose lower and upper hinges on door at base cabinet in the kitchen located at apt 1b, 1st story, 1st apartment from east at south , section ''north''First no access to re- inspect violation
Jun 29, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south , section ''north''First no access to re- inspect violation
May 17, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5k, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
May 17, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall in the foyer located at apt 5k, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
May 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the bathroom located at apt 5k, 5th story, 1st apartment from east at southFirst no access to re- inspect violation
May 08, 2023§ 27-2005 hmc: properly repair or replace the broken or defective inoperative bell and return buzzer/intercom system from 1st story publiic hall vestibule to in the foyer located at apt 4n, 4th story, 1st apartment from east at southNot complied with
May 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the 1st room from east located at apt 1v, 1st story, 3rd apartment from south at westNot complied with
May 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and north wall in the 1st bathroom from east located at apt 1k, 1st story, 1st apartment from east at southFirst no access to re- inspect violation
May 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north located at apt 4n, 4th story, 1st apartment from east at southNot complied with
May 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
May 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at east, the 2nd room from north at east, the 2nd room from north at west, the 1st room from north at west, the foyer , the private hallway located at apt 2w, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
Mar 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3o, 3rd story, 3rd apartment from north at east , section at southNot complied with
Feb 22, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Feb 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 2nd room from east, the foyer , the bathroom located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Feb 20, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4c, 4th story, 1st apartment from south at west , section at northNot complied with
Feb 08, 2023§ 27-2005 adm code replace with new the broken or defective door at the base cabinet on south wall in the kitchen located at apt 5c, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 08, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 03, 2023§ 27-2005 adm code refit the lower sash, window at east wall in the 1st room from east located at apt 5x, 5th story, 1st apartment from north at east , section at southNot complied with
Feb 03, 2023§ 27-2005 adm code properly repair the broken or defective entrance metal door in the foyer located at apt 2w, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
Jan 14, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5x, 5th story, 1st apartment from north at east , section at southNot complied with
Jan 09, 2023§ 27-2005 adm code refit door in the entrance located at apt 2w, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
Dec 12, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 4f, 4th story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Dec 12, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 4f, 4th story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Dec 12, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 4f, 4th story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Dec 12, 2022§ 27-2005 adm code properly repair the broken or defective electrical outlet at east wall in the kitchen located at apt 4f, 4th story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Dec 12, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 4f, 4th story, 1st apartment from west at north , section at northFirst no access to re- inspect violation
Oct 28, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Oct 28, 2022§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from east at south located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Oct 27, 2022§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1e, 1st story, 3rd apartment from south at west , section at northFirst no access to re- inspect violation
Oct 27, 2022§ 27-2005 adm code properly repair the broken or defective door at lower cabinet, south wall in the kitchen located at apt 1e, 1st story, 3rd apartment from south at west , section at northFirst no access to re- inspect violation
Oct 27, 2022§ 27-2005 adm code replace with new the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 1e, 1st story, 3rd apartment from south at west , section at northFirst no access to re- inspect violation
Oct 27, 2022§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north at west located at apt 1e, 1st story, 3rd apartment from south at west , section at northFirst no access to re- inspect violation
Jul 21, 2022§ 27-2005 adm code properly repair the broken or defective mechanical stopper at washbasin in the bathroom located at apt 3k, 3rd story, 1st apartment from east at south , section at northNot complied with
Jul 20, 2022§ 27-2011 adm code cleanse to the satisfaction of this department the visible evidence of mold grout north, east, and south walls at bathtub in the bathroom located at apt 3k, 3rd story, 1st apartment from east at south , section at northNot complied with
Jul 20, 2022§ 27-2005 adm code refit closet door at north wall in the private hallway located at apt 3k, 3rd story, 1st apartment from east at south , section at northNot complied with
Jun 01, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the kitchen , the 1st room from north at west located at apt 1v, 1st story, 3rd apartment from south at westNot complied with
Apr 21, 2022§ 27-2005 adm code refit upper wood cabinet door at north wall in the kitchen located at apt 2m, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 06, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Apr 06, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at south located at apt 4k, 4th story, 1st apartment from east at southFirst no access to re- inspect violation
Feb 16, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the kitchen , the bathroom located at apt 2n, 2nd story, 2nd apartment from west at northNot complied with
Feb 07, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling, north and west walls in the 1st room from east located at apt 4f, 4th story, 1st apartment from west at northFirst no access to re- inspect violation
Feb 07, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the private hallway , the foyer , the 2nd room from north, the kitchen located at apt 5k, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 07, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 5k, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Nov 29, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north, the foyer located at apt 2n, 2nd story, 1st apartment from west at northNot complied with
Jul 16, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from east at south located at apt 2m, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation
Jun 09, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, north wall in the bathroom located at apt 4c, 4th story, 1st apartment from south at westNot complied with
Dec 22, 2020§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2o, 2nd story, 3rd apartment from north at east , section at southFirst no access to re- inspect violation

Property Owners and Associates

185-225 Parkhill, LLC
Corporate Owner
1.8(3)

9 Properties

1108 Units

Anna Gomez
Site Manager, Head Officer
1.8(3)

9 Properties

1108 Units

Kimso Apartments LLC
Corporate Owner
1.8(3)

9 Properties

1108 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet