208 West 151 Street,Manhattan, NY 10039

120 Units

Built in 1929

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
264 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 233 violations which is 1.94 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
31Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
126Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
76Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 16, 2024§ 27-2005 adm code properly secure the loose sink in the kitchen located at apt a23, 2nd story, 1st apartment from north at eastNov sent out
Feb 07, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt a23, 2nd story, 1st apartment from north at eastNov sent out
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the entrance located at apt b27, 2nd story, 1st apartment from west at northInvalid certification
Jan 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 6 sq.ft at north wall baseboard at north wall in the 1st room from east at north located at apt b68, 6th story, 1st apartment from north at east , section at westNotice of issuance sent to tenant
Jan 06, 2024§ 27-2005 hmc: properly repair or replace the broken or defective intercom system located at apt b5 , 1st story, 1st apartment from south at westNov sent out
Dec 28, 2023§ 27-2005 hmc: properly repair or replace the broken or defective elecrtical light fixture at ceiling in the private hallway located at apt b5, 1st story, 3rd apartment from south at westNov sent out
Dec 28, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt b5, 1st story, 3rd apartment from south at westNov sent out
Dec 06, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the bathroom located at apt b41, 4th story, 1st apartment from north at eastInvalid certification
Dec 06, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt b41, 4th story, 1st apartment from north at eastInvalid certification
Dec 06, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation heat riser in the kitchen located at apt b41, 4th story, 1st apartment from north at eastInvalid certification
Sep 28, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser at east in the bathroom located at apt a23, 2nd story, 1st apartment from north at east , section ''a''Nov sent out
Sep 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the foyer located at apt a23, 2nd story, 1st apartment from north at east , section ''a''Nov sent out
Sep 28, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation radiator at south in the 1st room from east at south located at apt a23, 2nd story, 1st apartment from north at east , section ''a''Nov sent out
Aug 25, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the kitchenette located at apt a59, 5th story, 1st apartment from west at north , section ''a'', at southeastNov sent out
Aug 25, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling around window frame in the 3rd room from east located at apt a59, 5th story, 1st apartment from west at north , section ''a'', at southeastNov sent out
Jun 17, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the east wall and ceiling in the bathroom located at apt a31, 3rd story, 2nd apartment from west at northNot complied with
Mar 16, 2023(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Sep 21, 2021§ 27-2005 adm code refit the door in the entrance located at apt b8, 1st story, 2nd apartment from east at south , section at westFirst no access to re- inspect violation
Jul 18, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the closet at north wall in the private hallway located at apt a23, 2nd story, 1st apartment from north at east , section at eastFirst no access to re- inspect violation
May 02, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt a23, 2nd story, 1st apartment from north at east , section ''east-sec''First no access to re- inspect violation
Mar 05, 2021§ 27-2005 adm code replace with new the missing escutcheon plate at top of heat riser in the bathroom located at apt b26, 2nd story, 2nd apartment from east at southNot complied with
Oct 23, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and walls in the entire apartment located at apt b58, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Oct 05, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from east at north, the 3rd room from east at south, the 1st room from east, the kitchenette , the foyer located at apt a41, 4th story, 3rd apartment from south at west , section ''west''First no access to re- inspect violation
Jan 22, 2020§ 27-2005 adm code refit entrance door in the 2nd room from north at east located at apt a23, 2nd story, 1st apartment from west at north , 1st section from north at eastFirst no access to re- inspect violation
Jul 18, 2018§ 27-2005 adm code refit door in the bathroom located at apt b2, 1st story, 2nd apartment from east at southFirst no access to re- inspect violation
Jul 10, 2018§ 27-2005 adm code provide metal pans for marble saddle in the bathroom located at apt 6a, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Jul 10, 2018§ 27-2005 adm code properly repair the broken or defective intercom system at south wall in the private hallway located at apt 6a, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Jul 10, 2018§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 6a, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Jul 10, 2018§ 27-2005 adm code properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 6a, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
May 10, 2018§ 27-2005 adm code refit door. in the entrance located at apt a6, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

Deda Gjonaj
Head Officer
2.2(3)

5 Properties

311 Units

Gjonaj Management LLC
Agent
0(0)

4 Properties

201 Units

Victor Gjonaj
Site Manager
0(0)

1 Property

120 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet